Report of Test
On this date, a Rone Engineers, Inc. representative was. on site to perform
Pulverization/Gradation Testing. The results are attached.
Page i of 2
Teehnlcfan: Chris Webber
Report Disl~ibnflon:
(1) Ama'ice] Civil Consmlctors, Inc.
(Z) Ci~, of Cor~
LIM]'TATIONS: Tbe le~ results l~eSented ~ were v, ~,,~l tmscd upon the specffic ~M,?]ie~ i~ ~~ We asmm~ no rest~nfl'bil~ thr verJafion in qualit~
r~pofls nr~ for the exclusive use offl~ cheats to whom they m'~ naflv~ssed and ~1! not be ,~hced except m furl wJ~Kall thc writhe nl~zuvnl of Ron~ Eu~, ln~.
· JDK Page I of 1
RoneEngineers
DMm, TM 1~7'
214.630.9746 FAX 214.630.g~19
REPORT OF
GRADATIONS OF LIME TREATED S011.8
Client:
P sot:
American CMl Constructor~, Inc.
McAr~hur Park Parking Expansion
Coppell, TX
Report No.: 144524
Project Ne.: 025955
Date of Service: 02/23/2002
P~ge 2 of 2
Speciflcationa:
100% passing 1 3/4 sieve
60% passing #4 sieve
Weight Percent Weight Percent
Sample Retained Passing Retained Passing
Location Weight 1 3/4" sieve 1 3/4" sieve ~4 sieve ~4 sieve
10' south x 10' west of the northeast comer of northwest
I area 10.0 0 100% 2.8 72.0%
10' south x 10' east of the northwest comer of the
2 northwest area 10.0 0 100% 2.5 75.0%
3 Center of the northwest area 10.0 0 100% 3.1 69.0%
10' north x 10' east of the southwest comer of the
4 northwest area 10.0 0 100% 4.0 60.0%
10' north x 10' west of the southeast comer of the
5 northwest ama 10.0 0 100% 3.8 62.0%
10' north x 10' wsst of the southeast comer of the
6 northeast area 10.0 0 100% 3.5 65.0%
10' no~h x 10' east of the southwest comer of the
7 northeast area 10.0 0 100% 2.3 77.0%
8 Center of the northeast area 10.0 0 100% 2.1 79%
10' south x 10' west of the northeast comer of the
9 northeast area 10.0 0 100% 3.6 64%
10' south x 10' east of the northwest comer of the
10 norlheast area 10.0 '0 100% 3.4 66%
Add~onalCommen~:
89~ Ambasmdor Row
Dst!at. Texas 7S247..4SI0
(2~4) 630-y74s
(214) 620~81~ (fax)
REPORT OF PULVERIZATION/GRADATION TESTING
American Civil Constructors, Inc.
Attn~ Mr. R~ Shelley
Southlakc TX 76092
Report No,: 144523
Project No.: 025955
Date of Service: 02/23/2002
Report Date: 03/04/2002
Services:
Park~ Expansion
Pulve~zation/Cn~a *t~on Testing
Report of Test
On =his date, a Rone Engineers, Inc. representative was on si~e to perform
Pulverization/~radation Testing. The results are at~ache~.
Page 1 of 2
T~dmiehm: Chx4s Webber
Report Distribution:
(1) American Civil Constructors, Inc.
(l) ~ of Copp~
Rone En e.
99DK Page I of 1
RoneEngineers
214.~0.~45 FAX 214.6~,~1~
REPORT OF
GRADATION8 OF LIME TREATED $01L8
Client:
Project:
Amedcan Civil Constructors, Inc.
McArthur Park Parking ExpanSion
Coppell, TX
Date of Service:
Page 2 of 2
144523
025955
02/23/2002
Specifications:
100% passing I 3/4 sieve
60% passing . #4 sieve
Weight Percent Weight Percent
Sample Retained Passing Retained Passing
I.o~atlon Weight 1 3/4" Sieve I 3/4' sieve ~4 Sieve #4 Sieve
10' north x 10' west of the southeast comer of south
1 parking ama 10.0 0 100% 3.9 61.0%
60' north x 15' west of the southeast comer of south
2 parking ama 10.0 0 100% 3.7 63.0%
40' ewst x 35' north of the southeast comer of south
3 parking ama 10.0 0 100% 2.5 75.0%
75' west x 10' north of the southeast comer of south
4 parking ama 10.0 0 100% 3.2 68.0%
75' norlh x 50' north of the southeast comer of south
5 parking ama 10.0 0 100% 3.4 64.0%
10' south x 10' east of the northwest comer of south
6 parldn~ ama 10.0 0 100% 2.9 71.0%
10' north x 10' east of the southwest comer of south
7 pmldng area 10.0 0 100% 1.9 81.0%
45' south x 25' east of the northwest comer of south
8 parking ama 10.0. 0 100% 3.5 65%
68' east x 10' south of the northwest comer of south
9 parldn~ ama 10.0 0 100% 3.0 70%
65' east x 10' north of the southwest comer of south
10 parking area 10.0 0 100% 3.9 61%
Additional Comments: