PA0001-LR020228Ro gineers
8908 Ambassador Row
Dallas, Texas 75247=4510
(214) 630-9745
{214) 630-9819 (fax)
MOISTURE DENSITY RELATIONS
Client:
American Civil Constructors, Inc.
Atto: Mr. Rex Shelley
821 E. Southlake Blvd.
Southlake TX 76092
Report No.: 144563
Project No.: 025955
Date of Service: 02/23/2002
Report Date: 02/28/2002
Project: McArthur Park
Parking Expansion
Coppell, TX
Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in
accordance with ASTM Standards.
COt~rrRACTOR: American Civil Constructors
TEST FOR: Paving Subgrade
MATERIAL: Dark Grayish Brown Clay (Lime
Treated)
CLASSIFICATION: Paving Subgrade
TEST METHOD: ASTM D-698
Method A
ASTM D-4318 REPORT OF TEST
PROJECT DATA
DATE SAMPLED: 02/23/2002
MATERIAL PREPARATION: Moist
RAMMER TYPE: Mechanical
SAMPLED BY: C. Webber
SAMPLE LOCATION: On Site
MOISTURE DENSITY RELATIONS
MAXIMUM DRY DENSITY, pef: 95.5
OPTIMUM MoiSTURE CONTENT, %: 23.5
I00
LIQUID LIMIT: 32 Dry 98
PLASTIC LIMIT: 28 Density
(pet}
PLASTICITY INDEX: 4 96
94
92
Technician: Chris Webber
Report Distribution:
(1) American Civil Constructors, Inc.
18 20 22 24 26 28 30
MOISTURE CONTENT (%)
/~., Clay Stark
(I) City of Coppell . ~
Project
Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing, we assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature ofs mi ar subject matter provided by persons or conditions over which we have no coottol. Our letters and
reports are for thc exclusive use of thc clients to whom they am addressed and_shall not .be. reproduced except in full without the written approval of Rone Engineers, Inc.
rage I Ol 1
8908 Ambassador Row
~ T~e~ 7S247..4S10
(214) ~o-~19 (r~)
REPORT OF IN-PLACE DENSITY CANCELLATION
Arm: Mr. Rex Shelley
821 E. Southlak~ Blvd.
Southhke TX 76092
Report No.: 144725
Project No.: 025955
Date of Service: 02/26/2002
Report Date: 02/28/2002
Project: McAflhur Park
Parting Expsmion
Coppoll, TX
Report of Cancellation
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to perform Density Testing. Upon arrival, the technician was informed o£ job
cancellation.
TechnicianTime:
Page I of I
Technician: Ch.-'4s Webber
Report Distribution:
(i) ~ civil Construc~ Inc.
O) C~ of Coppen
3:00pm - 4:30pm
LIMITATIONS: The test results presented here~n we~ preperM breed upon the specific ~l,les prov~d~ h' ~ We a#ume no reapons/b/lity for vn~t/__'_,~ in qualit7
repom m~ for the e~clusive me of the climts to whom they fu~ ~ _A,u~d sad shall not be ~,~hu:~l exo~pt th full without the writtm ~j~ al of Rone Ensineers, Inc.
99DK Page I of 1