Loading...
SW0201-LR020215Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Quantum Contracting, Inc. DATE: 15 February 2002 PROJECT: 2001 Coppell Sidewalk Repair SUPPLIER: Hanson LOCATION OF POUR SET 1: Sidewalk paving in front of 51 7, 51 8, 524, and 525 Shadowcrest Lane LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 648 Cement Ticket No. 078801 Flyash Time Batched 12:00 N Sand Time Sampled 12:45pm in. Concrete Temp. (ASTM C1064l 66°F 1.0 in. Air Content (ASTM C231l 3.6% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 9339 COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 41 5.50 7 02/22/02 42 5.50 7 02/22/02 43 5.50 28 03/15/02 44 5.50 28 03/I 5/02 109,700 3880 117,400 4150 ~52,6Q0 5400 152,500 5390 28-Day Average 5400 3000 TECHNICIAN: DISTRIBUTION: CBC (12:00 Noon-2:O0pm) (1) Quantum Contracting, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Quantum Contracting, Inc. DATE: 15 February 2002 PROJECT: 2001 Coppell Sidewalk Repair SUPPLIER: Hanson LOCATION OF POUR SET 1: Sidewalk paving in front of 517, 51 8, 524, and 525 Shadowcrest Lane LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 9339 Truck No. 648 Cement Ticket No. 078801 Flyash Time Batched 12:O0 N Sand Time Sampled 12:45pm in. Concrete Temp. (ASTM C1064) 66°F 1 .O in. Air Content (ASTM C2311 3.6% Water Unit Weight (ASTM C138) Admix //1 Admix //2. AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM Cl 43) psi Strength 41 5.50 7 02/22/02 42 5.50 7 02/22/02 43 5.50 28 03/15/02 44 5.50 28 03/15/02 109,700 3880 117,400 4150 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: CBC (12:00 Noon-2:O0pm) (1) Quantum Contracting, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148