Loading...
ST0001-LR020708RoneEn g 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Report No.: 151546 Attn: Ms. Susan Taylor - Engineering Dept Project No.: 015729 PO Box 478 Date of Service: 06/07/2002 Coppell TX 75019 Report Date: 07/08/2002 Creekview Drive an~t l · Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: TX[ PLANT: 41 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIXDESIGN I.D.: 9982 PLACEMENT DATE: 06/07/2002 WEATHER CONDITIONS: Clear TIME SAMPLED: 12:40pm BATCH TIME: NA TEMPERATURE (F)-AIR 86 F CONCRETE: 84 F TRUCK rqO: 456 TIC~ZZT NO: 3144414 AIR CONTENT (%): 3.2 UNIT WEIGHT (per): NA OVERALL PLACEMENT LOCATION: Paving - south approach (red) to baseball fields SAMPLE LOCATION: REPORT OF TESTS 8' north x 2' west of southeast comer of approach Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 4.5 1 2 4.5 1 3 4.5 1 4 Technician: Jason Barker Report Distribution: (1) City of Coppell (1) City of Coppell (I) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 06/14/2002 7 109940 3890 07/05/2002 28 136885 4840 07/05/2002 28 135805 ~,~800 Average ~4820 Hold Started: FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap C Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over winch we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 of 1 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 151516 Project No.: 015729 Date of Service: 06/07/2002 Report Date: 07/08/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at thc placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-t43 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT DATE: 06/07/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 6:40am BATCH TIME: NA TEMPERATURE (F)-AIR 70 F CONCRETE: 80 F TRUCK NO: 1092 TICKET NO: 7117352 /aR CONTENT (%): 4.4 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Sidewalk in front of park at Creekview on Freeport Parkway SAMPLE LOCATION: REPORT OF TESTS 150' south x 2' east of northwest comer of sidewalk Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 06/14/2002 7 83830 2960 Unbonded Cap 1 2 5.25 07/05/2002 28 111370 3940 Unbonded Cap 1 3 5.25 07/05/2002 28 112405 3980 Unbonded Cap Average 3960 1 4 Hold Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 of 2 Report No.: 151516 Project No.: 015729 Client: City of Coppell RoneEngineers Notified contractor of slump. Technician: Eric White Report Distribution: (l) City of Coppell (1) City of Copp¢ll (1) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. Started: 5:30am Finished: 9:00am Rone ~ Cia' Stark Proje~ Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 2 of 2