Loading...
Creekview P2 L1R BA-CS020711 p i a r s E N G I N E E R I N G July 11, 2002 Ms. Teresa Turner City of Coppell 255 Parkway Blvd Coppell, TX 75019 Re: Salon on the Creek Creekview Phase II Addition Dear Ms. Turner: This letter is to request a waiver of the lime stabilized subgrade requirement for site paving on the subject tract. In lieu of the lime stabilized subgrade, we request the use of one additional inch of 3000psi paving over compacted subgrade. Please feel free to call if you have any questions. Sincerely, SPIARS ENGINEERING, INC. evin S. Wier SPIARS ENGINEERING, INC. 700 E. Park Blvd., Suite 210 Plano, TX 75074 (972) 422-0077 Fax: (972) 422-0075