Creekview P2 L1R BA-CS020711
p i a r s
E N G I N E E R I N G
July 11, 2002
Ms. Teresa Turner
City of Coppell
255 Parkway Blvd
Coppell, TX 75019
Re: Salon on the Creek
Creekview Phase II Addition
Dear Ms. Turner:
This letter is to request a waiver of the lime stabilized subgrade requirement for site paving on the
subject tract. In lieu of the lime stabilized subgrade, we request the use of one additional inch of
3000psi paving over compacted subgrade. Please feel free to call if you have any questions.
Sincerely,
SPIARS ENGINEERING, INC.
evin S. Wier
SPIARS ENGINEERING, INC.
700 E. Park Blvd., Suite 210 Plano, TX 75074 (972) 422-0077 Fax: (972) 422-0075