PERMIT COMPLIANCE CERTIFICATION
Permit Number:
Name of Permittee:
Date of Issuance:
Nation~ide Permit 14
Project N,n~her 199600765
City of Coppell
February 27, 1998
Upon completion of the activity authorized by this permit and any mitigation required by the
permit, sign this certification and return it to the following address:
Regulatory Branch
CESWF-EV-R
U.S. Army Corps of Engineers
P.O. Box 17300
Fort Worth, Texas 76102-0300
Please note that your permitted activity is subject to a compliance inspection by an U.S. Army
Corps of Engineers representative. ff you fail to comply with this permit you are subject to
permit suspension, modification, or revocation.
I hereby certify that the work authorized by the above referenced permit was completed in
accordance with the terms and conditions of the said permit, and required mRigation was
completed in accordance with the permit conditions.
Signature of Permittee
Kenneth H. Griffin, P.E.
Director of Public l~ork~/Engineering
2/17/00
Date
REPLY TO
ATTENTION OF:
DEPARTMENT OF THE ARMY
FORT WORTH DISTRICT, CORPS OF ENGINEERS
P.O. BOX 17300
FORT WORTH, TEXAS 76102-0300
February 27. 1998
Environmental Division
Regulatory Branch
SUBJECT: Project Number 199600765
7998
Mr. Ulys Lane III, P.E.
Wier & Associates, Inc.
4300 Beltway Place, Suite 130
Arlington, Texas 76018-1097
Dear Mr. Lane:
Thank you for your initial letter of October 22, 1996, and subsequent information of
January 23, 1998, concerning the proposed improvements to Denton-Tap Road including the
replacement of the existing bridge crossing of Denton Creek in the City of Coppell, Dallas and
Denton Counties, Texas. This project has been assigned Project Number 199600765. Please
include this number in all future correspondence concerning this project. Failure to ret~rence
the project number may result in a delay.
We have reviewed this project in accordance with Section 404 of the Clean Water Act
and Section 10 of the Rivers and Harbors Act of 1899. Under Section 404, the U. S. Army
Corps of Engineers (USACE) regulates the discharge of dredged and fill material into waters
of the United States, including wetlands. Our responsibility under Section 10 is to regulate any
work in, or affecting, navigable waters of the United States. Based on your description of the
proposed work, and other information available to us, we have determined that this project will
not involve activities subject to the requirements of Section 10. However, this project will
involve activities subject to the requirements of Section 404. Theretore, it will require
Department of the Army authorization.
It appears that this project is authorized by nationwide permit 14 for Road Crossings. To
use this permit, the person responsible for the project must ensure that the work is in
compliance with the specifications and conditions listed on the enclosures. Failure to comply
with these specifications and conditions invalidates the authorization and may result in a
violation of the Clean Water Act.
Our verification for the construction of an activity under this nationwide permit is valid
for two years from the date of this letter, unless prior to that date the nationwide permit is
suspended or revoked, or modified such that the activity would no longer comply with the
terms and conditions of the nationwide permit on a regional or national basis. Continued
confirmation that an activity complies with the specifications and conditions, and any changes
to the nationwide permit, is the responsibility of the permittee.
Our review of this project also addressed its effects on endangered species. Based on the
information provided, we have determined that this project will not affect any species listed as
threatened or endangered by the U.S. Fish and Wildlife Service within our permit area.
However, please note that you are responsible for meeting the requirements of general
condition 11 on endangered species.
The permittee must sign and submit to us the enclosed certification that the work,
including any required mitigation, was completed in compliance with the nationwide permit.
You should submit your certification within 30 days of the completion of work.
This permit should not be considered as an approval of the design features of any activity
authorized or an implication that such construction is considered adequate for the purpose
intended. It does not authorize any damage to private property, invasion of private rights, or
any infringement of federal, state, or local laws or regulations.
Thank you for your interest in our nation's water resources. If you have any questions
concerning our regulatory program, please contact Mr. David Madden at the address above or
telephone (817)978-4622. If you would like more information about our nationwide permit
program, please contact us and we will furnish you with a copy of the nationwide permit
regulations.
Sincerely,
Wayne A. Lea
Chief, Regulatory Branch
Enclosures
Copy Furnished:
Mr. Rollin MacRae
Texas Parks and Wildlife Department
4200 Smith School Road
NATIONWIDE PERMIT 14
Road Crossings
Effective Date: February I I, 1997
Fills t~r roads crossing waters of the United States (including wetlands and other special aquatic sites) provided the activity meets
all of the following criteria:
a. The width of the fill is limited to the minimum necessary for the actual crossing;
b. The fill placed in waters of the United States is limited to a filled area of no more than 1/3 acre. Furthermore, no more
than a total of 200 linear feet of the fill for the roadway can occur in special aquatic sites. including wetlands;
c. The crossing is culverted, bridged or otherwise designed to prevent the restriction of, and to withstand, expected high
flows and tidal flows, and to prevent the restriction of low flows and the movement of aquatic organisms;
d. The crossing, including all attendant features, both temporary and permanent, is part of a single and complete project
tbr crossing of a water of the United States; and,
e. For fills in special aquatic sites, including wetlands, the permittee notifies the District Engineer in accordance with the
"Notification" general condition. The notification must also include a delineation of affected special aquatic sites, including
wetlands.
This NWP may not be combined with NWP 18 or NWP 26 for the purpose of increasing the footprint of the road crossing. Some
road fills may be eligible for an exemption from the need for a Section 404 permit altogether (see 33 CFR 323.4). Also, where local
circumstances indicate the need, District Engineers will define the term "expected high flows" for the purpose of establishing
applicability. of this NWP. (Sections 10 and 404)
NATIONWIDE PERMIT CONDITIONS
GENERAL CONDITIONS: The following general conditions must be followed in order for any authorization by a NWP to be
valid:
1. Navigation: No activity may cause more than a minimal adverse effect on navigation.
2. Proper Maintenance: Any structure or fill authorized shall be properly maintained, including maintenance to ensure public
safety.
3. Erosion and Siltation Controls: Appropriate erosion and siltation controls must be used and maintained in effective
operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water
mark or high tide line. must be permanently stabilized at the earliest practicable date.
4. Aquatic Life Movements: No activity may substantially disrupt the movement of those species of aquatic life indigenous to
the waterbody, including those species which normally migrate through the area, unless the activity s primary purpose is to
impound water.
5. Equipment: Heavy equipment working in wetlands must be placed on mats, or other measures must be taken to minimize
soil disturbance.
6. Regional and Case-bv-Case Conditions: The activity must comply with any regional conditions which may have been added
by the Division Engineer (see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the state or tribe in
its section 401 water quality certification.
7. Wild and Scenic Rivers: No activity may occur in a component of the National Wild and Scenic River System; or in a river
officially designated by Congress as a "study river" for possible inclusion in the system, while the river is in an official study status;
unless the appropriate Federal agency, with direct management responsibility for such river, has determined in writing that the
proposed activity will not adversely effect the Wild and Scenic River designation, or study status. Information on Wild and Scenic
Rivers may be obtained t¥om the appropriate Federal land management agency in the area (e.g., National Park Service, U.S. Forest
Service, Bureau of Land Management, U.S. Fish and Wildlife Service.)
8. Tribal Rights: No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water
rights and treaty fishing and hunting rights.
9. Water Oualitv Certification: In certain states, an individual Section 401 water quality certification must be obtained or
waived {,see 33 CFR 330.4(c)).
10. Coastal Zone Management: In certain states, an individual state coastal zone management consistency concurrence must be
obtained or waived (see Section 330.4(d)).
11. Endano. qered Species:
A. No activity is authorized under any NWP which is likely to jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act. or which is
likely to destroy or adversely modify the critical habitat of such species. Non-federal permittees shall notify the District Engineer if
any [isted species or critical habitat might be affected or is in the vicinity of the project, and shall not begin work on the activity
until notified by the District Engineer that the requirements of the Endangered Species Act have been satisfied and that the activity
is authorized.
B. Authorization of an activity by a nationwide permit does not authorize the take of a threatened or endangered species as
defined under the Federal Endangered Species Act. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a
Biological Opinion with incidental take provisions, etc.) from the U.S. Fish and Wildlife Service or the National Marine Fisheries
Service. both lethal and non-lethal takes of protected species are in violation of the Endangered Species Act. Information on the
location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the U.S. Fish
and Wildlife Service and National Marine Fisheries Service or their world wide web pages at
http://www.fws.gov/-rgendspp/endspp.html and http://kingfish.spp.mnfs.gov/tmcintyr/prot_res.html#ES and Recovery,
respectively.
12. Historic Properties: No activity which may affect historic properties listed, or eligible for listing, in the National Register of
Historic Places is authorized, until the DE has complied with the provisions of 33 CFR Part 325, Appendix C. The prospective
permittee must notify the District Engineer if the authorized activity may affect any historic properties listed, determined to be
eligible. or xvhich the prospective permittee has reason to believe may be eligible for listing on the National Register of Historic
Places. and shall not begin the activity until notified by the District Engineer that the requirements of the National Historic
Preservation Act have been satisfied and that the activity is authorized. Information on the location and existence of historic
resources can be obtained from the State Historic Preservation Office and the National Register of Historic Places (see 33 CFR
330.4(g)).
13. Notification:
A. Timing: Where required by the terms of the NWP, the prospective permittee must notify the District Engineer with a
Pre-Constmction Notification (PCN) as early as possible and shall not begin the activity:
1. Until notified by the District Engineer that the activity may proceed under the NWP with any special conditions
imposed by the District or Division Engineer; or
2. If notified by the District or Division Engineer that an individual permit is required; or
3. Unless 30 days (or 45 days for NWP 26 only) have passed from the District Engineer's receipt of the notification
and the prospective permittee has not received notice from the District or Division Engineer. Subsequently, the permittee's right to
proceed under the NWP may be modified. suspended, or revoked only in accordance with the procedure set forth in 33 CFR
330.5(d)(2).
B. Contents of Notification: The notification must be in writing and include the following information:
1. Name, address and telephone numbers of the prospective permittee;
2. Location of the proposed project;
3. Brief description of the proposed project; the project's purpose; direct and indirect adverse environmental effects
the project would cause: any other NWP(s), regional general permit(s) or individual permit(s) used or intended to be used to
authorize any part of the proposed project or any related activity; and
4. For NWPs 14, 18, 21, 26, 29, 34, and 38, the PCN must also include a delineation of affected special aquatic
sites, including wetlands (see paragraph 13(1));
5. For NWP 21 - Surface Coal Mining Activities, the PCN must include an OSM or state approved mitigation plan.
6. For NWP 29-Single-Family Housing, the PCN must also include:
i. Any past use of this NWP by the individual permittee and/or the permittee's spouse;
ii. A statement that the single-family housing activity is Eor a personal residence of the permittee:
iii. A description of the entire parcel, including its size, and a delineation of wetlands. For the purpose of this
NWP, parcels of land measuring 0.5 acre or less will not require a formal on-site delineation. However, the applicant shall provide
an indication of where the wetlands are and the amount of wetlands that exists on the property. For parcels greater than 0.5 acre in
size, a formal wetland delineation must be prepared in accordance with the current method required by the Corps. (See paragraph
13(I));
iv. A written description of all land (including, if available. legal descriptions) owned by the prospective
permittee and/or the prospective permittee s spouse, within a one mile radius of the parcel, in any form of ownership (including any
land owned as a partner, corporation, joint tenant, co-tenant, or as a tenant-by-the- entirety) and any land on which a purchase and
sale agreement or other contract for sale or purchase has been executed;
7. For NWP 31 - Maintenance of Existing Flood Control Projects, the prospective permittee must either notify the
District Engineer with a Pre-Construction Notification (PCN) prior to each maintenance activity. or submit a five year (or less)
maintenance plan. In addition. the PCN must include all of the following:
i. Sufficient baseline information so as to identify the approved channel depths and configurations and existing
ti~cilities. Minor deviations are authorized, provided that the approved flood control protection or drainage is not increased;
ii. A delineation of any affected special aquatic sites, including wetlands; and,
iii. Location of the dredged material disposal site.
8. For NWP 33 - Temporary Construction, Access, and Dewatering, the PCN must also include a restoration plan
of reasonable measures to avoid and minimize adverse effects to aquatic resources.
C. Form of Notification: The standard individual permit application form (Form ENG 4345) may be used as the
notification but must clearly indicate that it is a PCN and must include all of the information required in (b) (I)-(7) of General
Condition 13. A letter may also be used.
D. District Engineer's Decision: In reviewing the pre-construction notification for the proposed activity, the District
Engineer will determine whether the activity. authorized by the NWP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. The prospective permittee may, optionally, submit a
proposed mitigation plan with the pre-construction notification to expedite the process and the District Engineer will consider any
optional mitigation the applicant has included in the proposal in determining whether the net adverse environmental effects of the
proposed work are minimal. If the District Engineer determines that the activity. complies with the terms and conditions of the
NWP and that the adverse effects are minimal, the District Engineer will notify the permittee and include an)' conditions the DE
deems necessary.
Any mitigation proposal must be approved by the District Engineer prior to commencing work. If the prospective permittee elects
to submit a mitigation plan, the District Engineer will expeditiously review the proposed mitigation plan. but will not commence a
second 30-day (or 45-day for NWP 26) notification procedure. lethe net adverse effects of the project (.with the mitigation
proposal) are determined by the District Engineer to be minimal, the District Engineer will provide a timely written response to the
applicant stating that the project can proceed under the terms and conditions of the nationwide permit.
If the District Engineer determines that the adverse effects of the proposed work are more than minimal, then he will notify the
applicant either: (1) that the project does not qualify for authorization under the NWP and instruct the applicant on the procedures
to seek authorization under an individual permit: (2) that the project is authorized under the NWP subject to the applicant's
submitting a mitigation proposal that would reduce the adverse effects to the minimal level; or (3) that the project is authorized
under the NWP with specific modifications or conditions.
E. Agency Coordination: The District Engineer will consider any comments fi-om Federal and State agencies concerning
the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the project's
adverse environmental etl~cts to a minimal level.
1. For NWP 14. 2 t, 26 (between I and 3 acres of impact). 29, 33, 37. and 38. The District Engineer will, upon
receipt of a notification. provide immediately, e.g., facsimile transmission, overnight mail or other expeditious manner, a copy to
the appropriate offices of the Fish and Wildlife Service, State natural resource or water quality agency, EPA, State Historic
Preservation Officer (SHPO), and, if appropriate, the National Marine Fishcries Service. With the exception of NWP 37, these
agencies will then have 5 calendar days from the date the material is transmitted to telephone or fax the District Engineer notice
that they intend to provide substantive, site-specific comments. If so contacted by an agency, the District Engineer will wait an
additional 10 calendar days (16 calendar days tier NWP 26 PCNs) betbre making a decision on the notification. The District
Engineer will fully consider agency comments received within the specified time frame. but will provide no response to the
resource agency. The District Engineer will indicate in the administrative record associated with each notification that the resource
agencies' concerns were considered. Applicants are encouraged to provide the Corps multiple copies of notifications to expedite
agency notification.
2. Optional Agency Coordination. For NWPs 5, 7, 12, 13.17, 18, 27, 31, and 34, where a Regional Administrator
of EPA, a Regional Director of USFWS, or a Regional Director of NMFS has formally requested general notification from the
District Engineer for the activities covered by any of these NWPs, the Corps will provide the requesting agency with notification
on the particular NWPs. However, where the agencies have a record of not generally submitting substantive comments on activities
covered by any of these NWPs. the Corps district may discontinue providing notification to those regional agency offices. The
District Engineer will coordinate with the resources agencies to identify, which activities involving a PCN that the agencies will
provide substantive comments to the Corps. The District Engineer may also request comments from the agencies on a case by case
basis when the District Engineer determines that such comments would assist the Corps in reaching a decision whether effects are
more than minimal either individually or cumutativety.
3. Optional Agency Coordination, 401 Denial. For NWP 26 only, where the state has denied its 401 water quality
certification for activities with less than I acre of wetland impact, the EPA regional administrator may request agency coordination
of PCNs between 1/3 and I acre. The request may only include acreage limitations within the 1/3 to 1 acre range for which the state
has denied water quality certification. In cases where the EPA has requested coordination of projects as described here, the Corps
will forward the PCN to EPA only. The PCN will then be forwarded to the Fish and Wildlife Service and the National Marine
Fisheries Service by EPA under agreements among those agencies. Any agency receiving the PCN will be bound by the EPA
timeframes for providing comments to the Corps.
F. Wetlands Delineations: Wetland delineations must be prepared in accordance with the current method required by the
Corps. For NWP 29 see paragraph (b)(6)(iii) for parcels less than 0.5 acres in size. The permittee may ask the Corps to delineate
the special aquatic site. There may be some delay if the Corps does the delineation. Furthermore, the 30-day period (45 days for
NWP 26) will not start until the wetland delineation has been completed and submitted to the Corps, where appropriate.
G. Mitigation: Factors that the District Engineer will consider xvhen determining the acceptabili~' of appropriate and
practicable mitigation include. but are not limited to:
1. To be practicable, the mitigation must be available and capable of being done considering costs, existing
technology, and logistics in light of the overall project purposes;
2. To the extent appropriate, permittees should consider mitigation banking and other forms of mitigation including
contributions to wetland trust funds. in lieu fees to organizations such as The Nature Conservancy, state or county natural resource
management agencies, where such li:es contribute to the restoration, creation, replacement, enhancement, or preservation of
wetlands. Furthermore, examples of mitigation that may be appropriate and practicable include but are not limited to: reducing the
size of the project; establishing wetland or upland buffer zones to protect aquatic resource values; and replacing the loss of aquatic
resource values by creating, restoring, and enhancing similar functions and values. In addition, mitigation must address wetland
impacts, such as functions and values, and cannot be simply used to offset the acreage of wetland losses that would occur in order
to meet the acreage limits of some of the NWPs (e.g.. for NWP 26, 5 acres of wetlands cannot be created to change a 6-acre loss of
wetlands to a I acre loss: however, 2 created acres can be used to reduce the impacts of a 3-acre loss.).
14. Compliance Certification: Every permittee who has received a Nationwide permit verification from the Corps will submit a
signed certification regarding the completed work and any required mitigation. The certification will be forwarded to the Corps
with the authorization letter and will include: a.) A statement that the authorized work was done in accordance with the Corps
authorization. including any general or specific conditions; b.) A statement that any required mitigation was completed in
accordance with the permit conditions: c.) The signature of the permittee certifying the completion of the work and mitigation.
15. Multiple Use of Nationwide Permits: In any case where any NWP number 12 through 40 is combined with any other NWP
number 12 through 40, as part of a single and complete project. the permittee must notil~, the District Engineer in accordance with
paragraphs a, b, and c on the Notification General Condition number 13. Any NWP number 1 through 11 may be combined with
any other NWP without notification to the Corps, unless notification is otherwise required by the terms of the NWPs. As provided
at 33 CFR 330.6(c) two or more different NWPs can be combined to authorize a single and complete project. However, the same
NWP cannot be used more than once for a single and complete project.
SECTION 404 ONLY CONDITIONS: In addition to the General Conditions, the following conditions apply only to activities that
involve the discharge of dredged or fill material into waters of the U.S.. and must be tollowed in order for authorization by the
NWPs to be valid:
1. Water Supply Intakes: No discharge of dredged or fill material may occur in the proximity of a public water supply intake
except where the discharge is for repair of the public water supply intake structures or adjacent bank stabilization.
2. Shellfish Production: No discharge of dredged or fill material may occur in areas of concentrated shellfish production, unless
the discharge is directly related to a shellfish harvesting activity authorized by NWP 4.
3. Suitable Material: No discharge of dredged or fill material may consist of unsuitable material (e.g., trash, debris, car bodies.
asphalt, etc.) and material discharged must be free from toxic pollutants in toxic amounts (see Section 307 of the Clean Water Act).
4. Mitigation: Discharges of dredged or fill material into waters of the United States must be minimized or avoided to the
maximum extent practicable at the project site (i.e., on-site), unless the District Engineer approves a compensation plan that the
District Engineer determines is more beneficial to the environment than on-site minimization or avoidance measures.
5. Spawnine Areas: Discharges in spawning areas during spawning seasons must be avoided to the maximum extent
practicable.
6. Obstruction of High Flows: To the maximum extent practicable. discharges must not permanently restrict or impede the
passage of normal or expected high flows or cause the relocation of the water (unless the primary purpose of the fill is to impound
waters).
7. Adverse Effects From Impoundments: If the discharge creates an impoundmerit of water, adverse effects on the aquatic
system caused by the accelerated passage of water and/or the restriction of its flow shall be minimized to the maximum extent
practicable.
8. Waterfowl Breedin~ Areas: Discharges into breeding areas for migratory waterfowl must be avoided to the maximum extent
practicable.
9. Removal of Temporarv Fills: Any temporary fills must be removed in their entirety and the affected areas returned to their
preexisting elevation.
NATIONWIDE PERMITS
The tbllowing is a list of the nationwide permits that became effective on February 11, 1997:
1. Aids to Navigation
2. Structures in Artificial Canals
3. Maintenance
4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
5. Scientific Measurement Devices
6. Survey Activities
7. Outfall Structures
8. Oil and Gas Structures
9. Structures in Fleeting and Anchorage Areas
10. Mooring Buoys
11. Temporary Recreational Structures
12. Utility Line Discharges
13. Bank Stabilization
14. Road Crossings
15. U.S. Coast Guard Approved Bridges
16. Return Water from Upland Contained Disposal Areas
17. Hydropower Projects
18. Minor Discharges
19. Minor Dredging
20. Oil Spill Cleanup
2l. Surface Coal Mining Activities
22. Removal of Vessels
23. Approved Categorical Exclusions
24. State Administered Section 404 Programs
25. Structural Discharges
26. Headwaters and Isolated Waters Discharges
27. Wetland and Riparian Restoration and Creation Activities
28. Modifications of Existing Marinas
29. Single-Family Housing
30. Moist Soil Management for Wildlife
31. Maintenance of Existing Flood Control Projects
32. Completed Enforcement Actions
33. Temporary Construction. Access and Dewatering
34, Cranberry Production Activities
35. Maintenance Dredging of Existing Basins
36. Boat Ramps
37, Emergency Watershed Protection and Rehabilitation
38. Cleanup of Hazardous and Toxic Waste
39. Reserved
40. Farm Buildings
TEXAS NATURAL RESOURCE CONSERVATION COMMISSION
Nationwide Permit Water Quality Certification Conditions
February 11, 1997
Page 1
Standard Provisions: These following provisions attach to any permit issued by the Corps of
Engineers and shall be followed by the permittee or any employee, agent, contractor or subcontractor
of the permittee during any phase of work authorized by a Corps permit.
1. The water quality ofwetlands shall be maintained in accordance with all applicable provisions
of the Texas Surface Water Quality Standards including the General, Narrative and Numerical
Criteria.
2. The applicant shall not engage in any activity which will cause surface waters to be toxic to
man, aquatic life or to terrestrial life.
3. Permittee shall employ measures to control spills of fuels, lubricants, or any other materials to
prevent them from entering a watercourse. All spills shall be promptly reported to the TNRCC,
Emergency Spill Response, at (512) 463-7727. Before using tire for fill material, the applicant must
obtain the necessary authorization from the Water Tire Recycling Program, MC223, TNRCC, P.O.
Box 13087, Austin, TX, 78711-3087. Phone number (512) 239-6001.
4. Sanitary wastes shall be retained for disposal in some legal manner. Marinas and similar
operations which harbor boats equipped with marine sanitation devices shall provide state/federal
permitted treatment facilities or pump out facilities for ultimate transfer to a permitted treatment
facility. Additionally, marinas shall display signs in appropriate locations advising boat owners that
the discharge of sewage from a marine sanitation device to waters in the state is a violation of state
and federal law.
5. Materials resulting from the destruction of existing structures shall be removed from the water
or areas adjacent to the water and disposed of in some legal manner.
6. A discharge shall not cause substantial and persistent changes from ambient conditions of
turbidity or color. The use of silt screens or other appropriate methods is encouraged to confine
suspended particulates.
7. The placement of any material in a watercourse or wetlands shall be avoided and placed there
only with the approval of the Corps when no other reasonable alternative is available. If work within
a wetland is unavoidable, gouging or rutting of the substrate is prohibited. Heavy equipment shall be
placed on mats to protect the substrate from gouging and rutting if necessary. Prior to the
construction of an impoundment, the applicant must obtain the necessary authorization from the
Water Rights Permitting Section, MC 148, TNRCC, P.O. Box 13087, Austin, TX, 78711-3087.
Phone number (512) 239-5901.
8. Dredge Material Placement: Dredged sediments shall be placed in such a manner as to prevent
any sediment runoff onto any adjacent property not owned by the applicant. Liquid runoff from the
disposal area shall be retained on-site or shall be filtered and returned to the watercourse from which
TEXAS NATURAL RESOURCE CONSERVATION COMMISSION
Nationwide Permit Water Quality Certification Conditions
February 11, 1997
Page 2
the dredged materials were removed. Except for material placement authorized by this permit,
sediments from the project shall be placed in such a manner as to prevent any sediment runoff into
waters in the state, including wetlands.
9. If contaminated spoil that was not anticipated or provided for in the permit application is
encountered during dredging, dredging operations shall be immediately terminated and the TNRCC,
Emergency Spill Response, shall be contacted at (5 12) 463-7727. Dredging activities shall not be
resumed until authorized by the Commission.
10. Contaminated water, soil or any other material shall not be allowed to enter a watercourse.
Noncontaminated stormwater from impervious surfaces shall be controlled to prevent the washing of
debris into the waterway.
I 1. Stormwater runoff from construction activities CLIS EPA Category X) are governed by the
requirements of the US Environmental Protection Agency. Applications to apply for a general permit
are to be obtained from Region 6, US EPA at (214) 665-7185.
12. Upon completion of earthwork operations all temporary fills shall be removed from the
watercourse/wetland and areas disturbed during construction shall be seeded, riprapped, or given
some other type of protection to minimize subsequent soil erosion. Any fill material shall be clean
and of such composition that it will not adversely affect the biological, chemical or physical properties
of the receiving waters.
13. Disturbance to vegetation will be limited to only what !s absolutely necessary. After
construction, all disturbed areas will be revegetated to approximate the pre-disturbance native plant
assemblage.
14. Where the control of weeds, insects and other undesirable species is deemed necessary by the
permittee, control methods which are nontoxic to aquatic life or human health shall be employed
when the activity is located in or in close proximity to water, including wetlands.
15. Concentrations of taste and odor producing substances shall not interfere with the production of
potable water by reasonable water treatment methods, impart unpalatable flavor to food fish including
shellfish, result in offensive odors arising from the water, or otherwise interfere with reasonable use
of the water in the state.
16. Surface water shall be essentially free of floating debris and suspended solids that are
conducive to producing adverse responses in aquatic organisms or putreseible sludge deposits or
sediment layers which adversely affect benthie biota or any lawful uses.
17. Surface waters shall be essentially free of settleable solids conducive to changes in flow
characteristics of stream channels or the untimely filling of reservoirs, lakes and bays.
TEXAS NATURAL RESOURCE CONSERVATION COMMISSION
Nationwide Permit Water Quality Certification Conditions
February 11, 1997
Page 3
18. The work of the applicant shall be conducted such that surface waters are maintained in an
aesthetically attractive condition, foaming or frothing of a persistent nature is avoided and surface
waters shall be maintained so that oil, grease, or related residue will not produce a visible film of oil
or globules of grease on the surface or coat the banks or bottoms of the watercourse.
19. This certification shall not be deemed as fulfilling the applicant's/permittee's responsibility to
obtain additional authorization/approval from other local, state or federal regulatory agencies having
special/specific authority to preserve and/or protect resources within the area where the work will
occur.
Additional Conditions of Section 401 Certification for Specific Nationwide Permits:
Nationwide Permit 13 (Bank Stabilization)
Before using tires for bank stabilization, the applicant must obtain the necessary authorization from
the Waste Tire Recycling Program, MC 223, TNRCC, P.O. Box 13087, Austin, TX, 78711-3087.
Phone number (512) 239-6001.
Nationwide Permit 16 (Return Water From Upland Disposal Areas)
Effluent from an upland contained dredged material disposal area shall not exceed a Total Suspended
Solids (TSS) concentration of 300 mg/I unless an individual certification has been issued with site-
specific TSS limits.
There may be times during the term of this Nationwide Permit when the TNRCC identifies areas with
contaminated sediment. After the TNRCC identifies these areas in writing to the Corps, persons filing
a predischarge notice for work in one of these areas will be required to obtain an individual Section
401 certification or waiver from the state.
Because of potential mercury contamination of the sediments in Cox Bay and Lavaca Bay, any retum
flow from activities occurring there will require an individual Section 401 certification or waiver.
Nationwide Permit 19 (Minor Dredging)
There may be times during the term of this Nationwide Permit when the TNRCC identifies areas with
contaminated sediment. After TNRCC identifies these areas in writing to the Corps, persons filing a
predischarge notice for work in one of these areas will be required to obtain an individual Section 401
certification or waiver from the state.
Because of potential mercury contamination of the sediments in Cox Bay and Lav,~aca Bay, any
dredging activities occurring there will require an individual Section 401 certification or waiver.
TEXAS NATURAL RESOURCE CONSERVATION COMMISSION
Nationwide Permit Water Quality Certification Conditions
February 11, 1997
Page 4
Nationwide Permit 26 (Headwaters and Isolated Waters Discharges)
The TNRCC reserves the right to modify certification of this permit if additional information
identifies specific areas where significant impacts, including cumulative or secondary impacts, are
occurring and the use of this Nationwide Permit would be inappropriate.
Nationwide Permit 31 (Maintenance of Existing Flood Control Projects)
This certification is limited to those projects which have received a U.S. Army Corps of Engineers
authorization for construction or maintenance after 1977.
Nationwide Permit 35 (Maintenance Dredging of Existing Basins)
There may be times during the term of this Nationwide Permit when the TNRCC identifies areas with
contaminated sediment. After TNRCC identifies these areas in writing to the Corps, persons filing a
predischarge notice for work in one of these areas will be required to obtain an individual Section 401
certification or waiver from the state.
Because of potential mercury contamination of the sediments in Cox Bay and Lavaca Bay, any
dredging activities occurring there will require an individual Section 401 certification or waiver.