Loading...
Freeport NIP(7.9)-LR020708‘..yurwer Set No. va•a Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 1154 4.50 11:10AM 96 90 N/A 3161181 REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction Location of Sample Design Information Source of Concrete 1 Test Results Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn Chandler- Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell /Mr. Lee Stone (1) Osburn Contractors/ Mr. Collin LaFavors g/ CONCRETE CYLINDER TEST REPORT Uline Facility Freeport Parkway Coppell, Texas 2424 STUTZ DR. SUITE 400 DA AS, TX 75235 TEL [214] 350 5600 REEc I Er7GIIMEERIr 1G GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 25 REG PROJECT NO. 9056 SAMPLE DATE: 07 -08 -02 TECHNICIAN: S. Davis Quantity Represented Set Number Location 1 Piers: A.3 -9, A.6 -9, A.9 -9, B.5 -9 and C.5 -9 10/10 Mix Identification Specified Strength p.s.i. TXI 45 3000 Set No. Cylinder ID Date Tested otal Load lbs. Com Str Average Strength p.s.i. 1 1154 1154 1154 1154 07 -15 -02 08 -05 -02 08 -05 -02 Hold 28 H 65460 Submitted by: REED ENGINEERING GROUP, INC. Original Signed By G R O U Keith Atkins KEA/je 7 1 via° FAX [214] 350 0019 Vy.VGI Set No. VG•M Cylinder ID Slump Time of Sample Air Temp. Concrete Temp. Air Entrainment Ticket Number 1 1154 4.50 11:10AM 96 90 N/A 3161181 REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction Location of Sample Design Information Test Results CONCRETE CYLINDER TEST REPORT Uline Facility Freeport Parkway Coppell, Texas FREEa EI IGI I EERIIIG GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 25 REG PROJECT NO. 9056 SAMPLE DATE: 07 -08 -02 TECHNICIAN: S. Davis Quantity Represented Set Number I Location Piers: A.3 -9, A.6 -9, A.9 -9, B.5 -9 and C.5 -9 1 10/10 Source of Concrete Mix Identification Specified Strength p.s.i. TXI 45 3000 Set No. Cylinder ID Date Tested Age Test Total Load lbs. Compressive Strength p.s.i. Average Strength p.s.i. 1 1154 1154 1154 1154 07 -15 -02 08 -05 -02 08 -05 -02 Hold 7 28 28 H 65460 89310 90210 2320 3160 3190 3180 Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn Chandler- Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell /Mr. Larry Davis (1) City of Coppell /Mr. Lee Stone (1) Osburn Contractors/ Mr. Collin LaFavors Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 GRcL i