Loading...
Freeport NIP(7.9)-LR020627 (2)GEOTECHNICALAND t G F;;J r-I I I F:::1 I:NViRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Uline Facility Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox REPORT NO. 22 REG PROJECT NO. 9056 SAMPLE DATE: 06-27-02 TECHNICIAN: S. Davis CONTRACTOR: Duke Construction Location of Sample ISet Number I Location I Quantity Represented 1 Piers: G-6, F-6, E-6, D-6 and C-6 10/10 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. TXI 45 3000 'est Results Set Cylillder I Age@ I m°tal L°ad I C°mpressive I No. ID Date Tested Test lbs. Strength p.s.i. 1 1076 07-04-02 7 66800 2360 1076 07-25-02 28 1076 07-25-02 28 1076 Hold H Average Strength p.s.i. Cylinder Data Set CylinderI Timeo, ] [Concrete[ Air N . ID Slump Sample Air Temp. Temp. Entrainment ~ 1076 4.00 12:00PM 86 90 N/A Ticket Number 3158079 Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Osburn Contractors/ Mr. Collin LaFavors Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. ,, SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND ~ ~ r-I I I F~ ENVlRONF1ENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Iline Facility port Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox REPORT NO. 22 REG PROJECT NO. 9056 SAMPLE DATE: 06-27-02 TECHNICIAN: S. Davis CONTRACTOR: Duke Construction Location of Sample Set Number I Location 1 Quantity Represented Piers: G-6, F-6, E-6, D-6 and C-6 10/10 Design Information I Source of Concrete I Mix Identification TXI 45 Specified Strength p.s.i. 3000 Test Results No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 1076 07-04-02 7 66800 2360 1076 07-25-02 28 110040 3890 1076 07-25-02 28 112150 3970 3930 1076 Hold H Cylinder Data Set Cylinder I Time of Concrete Air Ticket No. ID I Slump Sample Air Temp. Temp. Entrainment Number 1076 4.00 12:00PM 86 90 N/A 3158079 Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Hads (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Osburn Contractors/ 2424 STUTZ DR. · Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je Mr. Collin LaFavors ~ SUITE 400 · DALLAS, TX 75235 ,, TEL [214] 350 5600 · FAX [214]