Loading...
Creekview P2 L1R BA-CS020719T H E C 1 T Y O F COPPELL T ~~' ~ t _ o ~ S ~ ~ July 19, 2002 John W. Spiars, P.E. Spiars Engineering, Inc. 700 E. Park Blvd. , Suite 210 Plano, TX 75074 RE: Salon on the Creek Construction Plan Comments - 3`d Review Dear Mr. Spiars: The City of Coppell has reviewed the revised plans for the referenced addition and with the following conditions, the plans will be approved. Condition 1 - it may be necessary to relocate the existing telephone pole and guy wires on Denton Tap Road to meet minimum sidewalk width of 5 feet. Condition 2 -coordinate work with Landscape Manager, John Elias (972) 304-7001, on plant replacement in the modified median to ensure that all landscape requirements aze met. Please submit revised copies for the City Engineer's stamp. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. These fees consist of impact and construction inspection fees to be paid to this office as requested in the Fee Assessment Letter dated July 19, 2002. The City assesses a 2% inspection fee for all private construction and 4% for public installations. If you have any questions, please contact me at (972) 304-3681. Sincerely, ~~~~ Teresa Turner, E.I.T. Graduate Engineer Office Phone: (972) 304-3681 Fax: (972)304-3570 255 PAFKWAV # P. O.BOX 478 * CO PPELL T% 75019 * TEL 972/462 0022 # FAX 972/304 3673