Loading...
ST9303-CS 980126 I LOUIS CONSTRUCTION, INC. 2401 Avenue J, Suite 202 · RO. Box 202384 Arlington, Texas 76006 January 26, 1998 817~640-7737 Office ° 817/640-0030 Fax Equal Opportunity Employer / Contrador 01-28--~28 AlO:4~ IN City of Coppell 255 Parkway Blvd. P.O. Box 478 Coppell, Texas 75019 Attn: Mr. Michael A. Martin, P.E., Assistant City Engr. Re: Denton Tap Road Left Turn Lane for Vista Ridge United Methodist Church In accordance with your recent request the following shall serve as our breakdown of costs associated with the storage and taper for the above referenced turn lane: 1. Unclassified Excavation 70 CY $5.00 $350.00 11. 6" Lime Subgrade 181 SY $1.25 $226.25 12. Hydrated Lime 2.72 TN $90.00 $244.80 13. 8" Reinf. Conc. Street Paving 181 SY $19.85 $3,592.85 24. Refl. White Pvmt. Markers 40 EA $5.00 $200.00 25. Non-Refl. White Pvmt. Markers 40 EA $3.00 $120.00 TOTAL AMOUNT $4,733.90 Should anything further be required of us, please do not hesitate to call. Sincerely, S.J. LOUIS CONSTRUCTION, INC. Les V. Whitman Vice President / Division Mgr. c: #9733 file Mr. Bill Hepworth, P.E., City of Lewisville