ST9303-CS 980126 I
LOUIS CONSTRUCTION,
INC.
2401 Avenue J, Suite 202 · RO. Box 202384
Arlington, Texas 76006
January 26, 1998
817~640-7737 Office ° 817/640-0030 Fax
Equal Opportunity Employer / Contrador
01-28--~28 AlO:4~ IN
City of Coppell
255 Parkway Blvd.
P.O. Box 478
Coppell, Texas 75019
Attn: Mr. Michael A. Martin, P.E., Assistant City Engr.
Re:
Denton Tap Road
Left Turn Lane for Vista Ridge
United Methodist Church
In accordance with your recent request the following shall serve as our breakdown of costs
associated with the storage and taper for the above referenced turn lane:
1. Unclassified Excavation 70 CY $5.00 $350.00
11. 6" Lime Subgrade 181 SY $1.25 $226.25
12. Hydrated Lime 2.72 TN $90.00 $244.80
13. 8" Reinf. Conc. Street Paving 181 SY $19.85 $3,592.85
24. Refl. White Pvmt. Markers 40 EA $5.00 $200.00
25. Non-Refl. White Pvmt. Markers 40 EA $3.00 $120.00
TOTAL AMOUNT $4,733.90
Should anything further be required of us, please do not hesitate to call.
Sincerely,
S.J. LOUIS CONSTRUCTION, INC.
Les V. Whitman
Vice President / Division Mgr.
c: #9733 file
Mr. Bill Hepworth, P.E., City of Lewisville