Loading...
Gateway BP(1.1)-CS 910910The City With A Beautiful Future 1 ....5 September 10, 1991 Mr. Patrick L. Acker, P.E. Albert N. Halff Associates, Inc. 8616 Northwest Plaza Drive Dallas, TX 75225 Re: Gateway Business Park Grapevine Creek Drainage Improvements Construction Inspection Fees Dear Mr. Acker: Sincerely, M. Shohre Daneshmand, P.E. Acting City Engineer MSD /GCH /bd cc: Gary L. Sieb, Director of Planning and Community Services Larry Davis, Construction Inspector Bill Gibson, Gibson Associates Carolyn Bebermeyer, Finance Department P.O. Box 478 Coppell, Texas 75019 214- 462 -0022 We have reviewed your request dated August 6, 1991, concerning a reduction in the construction inspection fees. Our records indicate that we received a check from Gibson Associates, Inc. in the amount of $8,057.80, made payable to the City of Coppell on August 9, 1991. This payment was for the construction inspection fee and was calculated based on 2% of the estimated construction cost of $402,890.00. The basis for the construction inspection fee calculation did not include item No. 10A, accelerated schedule, in the amount of $59,540.00. Any adjustments in the construction inspection fees will be considered at the final inspection of this project. At that time, all construction costs will be identified, and the fee adjusted as necessary. In accordance with the subdivision ordinance, all construction activity costs are included in the inspection fee calculation. Any variation from this procedure requires City Council approval. If you have any questions concerning this matter, please contact myself or Larry Davis, Construction Inspector, at (214) 393 -1016.