Loading...
Gateway BP(1.1)-CS 910917E MI ALBERT H. HALFF ASSOCIATES, INC. E MI ENGINEERS SCIENTISTS SURVEYORS ■I DALLAS ARLINGTON CHICAGO FORT WORTH City of Coppell P.O. Box 478 Coppell, TX 75019 Dear Ms. Daneshmand: 8616 NORTHWEST PLAZA DRIVE DALLAS. TEXAS 75225 214i739 -0094 FAX 214;739-0095 Attn: Ms. Shohre Daneshmand, P.E. Acting City Engineer Re: Gateway Business Park Grapevine Creek Drainage Improvements Construction Inspection Fees In response to your letter dated September 10, 1991, our request on behalf of the Owner, Catellus Development Corporation, for a reduction in the calculated construction inspection fees for this project is concerning the construction items on which the fee has been based. On previous projects the construction inspection fee for the City of Coppell has only been charged for items of work to be dedicated to the City of Coppell. For this project, it is our understanding that the only item of work to be dedicated to and maintained by the City of Coppell is the concrete drop structure itself. Accordingly, the following items of work should not be included in the construction inspection fee calculation: 1. Clear Grub and Excavation 26,000 C.Y. 2.25/C.Y. 2. Rock Rip Rap 1,400 C.Y. 65.00 /C.Y. 8. Hydromulch 6 Acres 3,375.00 /Acre September 17, 1991 AVO 10565 58,500.00 91,000.00 20,250.00 Subtotal $169,750.00 Note: Item 10A is not included as per your previous letter dated September 10, 1991. TRANSPORTATION WATER RESOURCES LAND DEVELOPMENT MUNICIPAL ENVIRONMENTAL STRUCTURAL SURVEYING GLOBAL POSITIONING SYSTEM (G. P. S.) REMOTE SENSING AND MAPP■.G LANDSCAPE ARCHITECTURE PLANNING MI ALBERT H. HALFF ASSOCIATES, INC. Mill ENGINEERS SCIENTISTS SURVEYORS City of Coppell September 17, 1991 Page 2 The items that should be included in the Construction Inspection Fee calculations are: 3. Structural Excavation 1 L.S. 111,700/L.S. 4. Class C 400 psi Conc. for Cutoff Walls 100 C.Y. 200.00 /C.Y. 5. Class C 400 psi Conc. for Block Sill 170 C.Y. 250.00/C.Y. 6. Class C 400 psi Conc. for Sidewalls 130 C.Y. 250.00 /C.Y. 7. Galvanized Pipe Rail 160 L.F. 25.00/ft. 9. Two Rub Finish 1 L.S. 2,390.00/L.S. 11. Select Backfill 940 C.Y. 7.50 /C.Y. Subtotal Construction Inspection Fee for Items 3 thru 7, 9 and 11: $220,140 2.0% 111,700.00 20,000.00 42,500.00 32,500.00 4,000.00 2,390.00 7,050.00 $220,140.00 $4,402.80 We understand and agree that the final inspection fee shall be based on the items actually installed and as such is adjusted at the time of final inspection. However, we would request that the items to be included in the construction inspection fee and the items of work to be dedicated to the City of Coppell for floodway and maintenance purposes be reviewed and agreed upon prior to the final inspection. Please note that the Owner will dedicate the channel area to the City of Coppell for floodway and maintenance purposes, if this is desirable to the City of Coppell, and as such the construction inspection fee of $8,057.80 would be correct. ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS SCIENTISTS SURVEYORS ■u■ City of Coppell September 17, 1991 Page 3 In addition to this request, our client Catellus Development Corporation has not received any comments on their letter to Mr. Allan Ratliff, City Manager from Mr. Wayland Threadgill dated August 27, 1991 concerning the maintenance agreement and easement requirements for this project. Again these issues should be resolved as soon as possible. The concrete work for the drop structure is complete. The remainder of the work is anticipated to be complete and ready for final approval by the end of next week. If you have any questions or require any further information concerning this matter, please contact me. If a meeting to discuss these items would be beneficial, I will be glad to arrange it. /jj cc: Wayland Threadgill, Catellus Gary L. Sieb, Dir. of Planning Comm. Serv. Larry Davis, Construction Inspection Bill Gibson, Gibson Associates Very truly yours, ALBERT H. HALFF ASSOCIATES, INC. 61 c Patrick L. Acker, P.E.