ST0001-CS020719Suzan Taylor - RE: Side on Creekvie Page 1
} (A110A -
From: "Schnitger, Chris" < cschnitger @sradesign.com>
To: 'Suzan Taylor' <staylor @ci.coppell.tx.us> 1 ,'
Date: 7/19/02 11:23AM
Subject: RE: Sidewalk on Creekview
How does 2:00 sound? I'd really like to get these issues resolved also, I'm - --
want to keep ISI moving so we can get this project finished. I have the _
utmost confidence in the sidewalk plans and I want to stick with them as
much as possible.
Chris
Chris Schnitger, P.E.
Schrickel, Rollins & Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649 -3216
(817 649 -7645 FAX
- - - -- Original Message---- -
From: Suzan Taylor [mailto :staylor @ci.coppell.tx.us]
Sent: Friday, July 19, 2002 11:02 AM
To: cschnitger @sradesign.com
Subject: RE: Sidewalk on Creekview
Let me know what time - Larry wants to look at the grades as soon as
possible.
Thanks
>>> "Schnitger, Chris" < cschnitger @sradesign.com> 07/19/02 10:59AM >>>
I won't be able to make it this afternoon but we can set something up
for
Monday after lunch. . w
Chris
Chris Schnitger, P.E.
Schrickel, Rollins &Assoc.
1161 Corporate Dr. W.; Ste. 200
Arlington, Texas 76006
(817) 649 -3216
(817 649 -7645 FAX
- - -- Original Message---- -
From: Suzan Taylor [ mailto :staylor @ci.coppell.tx.us]
Sent: Friday, July 19, 2002 10:46 AM
To: cschnitger @sradesign.com
Subject: Sidewalk on Creekview
Chris: O
Larry wants to know if you can meet him today at 2:00 to look at the
grades on the sidewalk. He wants to look at the grades from the back #14
of V
curb to the sidewalk and the grade on the sidewalk on the east end,
near
the gabions. �