Loading...
ST0001-CS020630A LEIGH COMPANY GEOTECHNICAL ENGINEERING • GEOLOGICAL STUDIES • DISTRESS INVESTIGATIONS • PAVEMENT DESIGN • ADVANCED GEOTECHNICAL TESTING • FOUNDATION RECOMMENDATIONS • CONSTRUCTION MONITORING CONSTRUCTION MATERIALS TESTING • CONSTRUCTION OBSERVATION • CONCRETE TESTING • ASPHALT TESTING • SOILS TESTING • PIER INSPECTION • POST TENSION INSPECTION • NON-DESTRUCTIVE TESTING • STRUCTURAL STEEL INSPECTION • SPECIAL TESTING DRILLING SERVICES • MONITOR WELL INSTALLATION • ENVIRONMENTAL DRILLING • GEOTECHNICAL DRILLING DALLAS 8908 AMBASSADOR ROW DALLAS, TEXAS 75247 TELEPHONE 214 - 630 -9745 FACSIMILE 214- 630 -9819 FORT WORTH 121 NORTH RAYNER STREET FORT WORTH, TEXAS 76111 TELEPHONE 817 - 831-6211 METRO 817 - 429 -4328 FACSIMILE 817- 834 -4833 June 30, 2002 City of Coppell Ms. Susan Taylor P. O. Box 478 Coppell, TX 75019 Reference: Creekview Drive & Freeport Parkway Coppell, Texas Dear Ms. Taylor, Enclosed with this letter and monthly invoice is a copy of the Budget Report for the noted project. This report represents a detailed summary of the services performed on the project by Rone Engineers. The project totals represent the original estimated budget, amount invoiced to date, and the remaining balance available for our services. If there was no budget established for your project, then the project is considered to be atime and material project and the invoiced amount is the total that has been billed to the project as of this date. Please call (214) 630 -9745 if you have any questions regarding this matter. Sincerely, RO Cla CMT Project Manager INC. Project No.: 015729 Budget Report Creekview Drive and City of Coppell Freeport Parkway Coppell, TX $ 0 (f Coi*rqP �p P1 Or 0000 O"Or C Ii*o1'�� i 4A 6- 717 e Jul 11,02 2:18pm Page I Budget Invoiced Remaining BillCode Description Units Amount Units Amount Units Amount 1001 Concrete Technician (hourly) 400.00 11,000.00 146.75 4,035.63 253.25 6,964.37 -55.00 1001C Concrete Technician Cancellati 0.00 0.00 2.00 3.50 55.00 96.25 -2.00 -3.50 -96.25 1001S Concrete Technician Standby (H 0.00 0.00 6.50 268.13 -6.50 - 268.13 1002 Concrete Technician OT (hourly 0.00 0.00 8,710.00 261.00 3,393.00 409.00 5,317.00 1003 Concrete Test Cylinders (each) 670.00 290.00 2.00 290.00 0.00 0.00 1500 Asphalt Extraction & Gradation 2.00 0.00 1.00 66.00 -1.00 -66.00 1502 Asphalt Maximum Theoretical 0.00 4.00 110.00 4.00 110.00 0.00 0.00 1601 2001 Asphalt Technician (hourly) Soils Technician (hourly) 104.00 2,860.00 94.25 2,591.88 9.75 268.12 2005 In -Place Density Test (each) 148.00 1,924.00 111.00 1,443.00 26.00 37.00 -2.00 481.00 -26.00 2005R In -Place Density Test (Retesti 0.00 0.00 156.00 2.00 16.00 208„00 -4.00 -52.00 2007 Pulverizations (each) 12.00 0.00 0.00 2.00 26.00 -2.00 -26.00 2008 Lime Depth Checks (each) 9.00 1,170.00 6.00 780.00 3.00 390.00 2010 Moisture Density Relationship 9.00 360.00 6.00 240.00 3.00 120.00 2020 7001 Atterberg Limits (each) Transportation Charge (trip) 94.00 1,222.00 88.00 1,144.00 6.00 78.00 7001C Transportation Charge (Trip) C 0.00 0.00 1.00 13.00 1,908.50 -1.00 -0.60 -13.00 -33.00 7002 Engineering & Report Review 34.10 1,875.50 34.70 0.30 16.50 -0.30 -16.50 7002C Engineering and Report Review 0.00 0.00 Project totals: 29,677.50 16,710.89 12,966.61 $ 0 (f Coi*rqP �p P1 Or 0000 O"Or C Ii*o1'�� i 4A 6- 717 e Jul 11,02 2:18pm Page I