ST0001-CS020630A LEIGH COMPANY
GEOTECHNICAL ENGINEERING
• GEOLOGICAL STUDIES
• DISTRESS INVESTIGATIONS
• PAVEMENT DESIGN
• ADVANCED GEOTECHNICAL TESTING
• FOUNDATION RECOMMENDATIONS
• CONSTRUCTION MONITORING
CONSTRUCTION MATERIALS TESTING
• CONSTRUCTION OBSERVATION
• CONCRETE TESTING
• ASPHALT TESTING
• SOILS TESTING
• PIER INSPECTION
• POST TENSION INSPECTION
• NON-DESTRUCTIVE TESTING
• STRUCTURAL STEEL INSPECTION
• SPECIAL TESTING
DRILLING SERVICES
• MONITOR WELL INSTALLATION
• ENVIRONMENTAL DRILLING
• GEOTECHNICAL DRILLING
DALLAS
8908 AMBASSADOR ROW
DALLAS, TEXAS 75247
TELEPHONE 214 - 630 -9745
FACSIMILE 214- 630 -9819
FORT WORTH
121 NORTH RAYNER STREET
FORT WORTH, TEXAS 76111
TELEPHONE 817 - 831-6211
METRO 817 - 429 -4328
FACSIMILE 817- 834 -4833
June 30, 2002
City of Coppell
Ms. Susan Taylor
P. O. Box 478
Coppell, TX 75019
Reference: Creekview Drive & Freeport Parkway
Coppell, Texas
Dear Ms. Taylor,
Enclosed with this letter and monthly invoice is a copy of the Budget Report for the
noted project. This report represents a detailed summary of the services performed on
the project by Rone Engineers. The project totals represent the original estimated
budget, amount invoiced to date, and the remaining balance available for our services.
If there was no budget established for your project, then the project is considered to be
atime and material project and the invoiced amount is the total that has been billed to
the project as of this date.
Please call (214) 630 -9745 if you have any questions regarding this matter.
Sincerely,
RO
Cla
CMT Project Manager
INC.
Project No.: 015729 Budget Report
Creekview Drive and City of Coppell
Freeport Parkway
Coppell, TX
$ 0 (f Coi*rqP �p
P1 Or
0000 O"Or C Ii*o1'��
i 4A 6-
717 e
Jul 11,02 2:18pm Page I
Budget
Invoiced
Remaining
BillCode
Description
Units
Amount
Units
Amount
Units
Amount
1001
Concrete Technician (hourly)
400.00
11,000.00
146.75
4,035.63
253.25
6,964.37
-55.00
1001C
Concrete Technician Cancellati
0.00
0.00
2.00
3.50
55.00
96.25
-2.00
-3.50
-96.25
1001S
Concrete Technician Standby (H
0.00
0.00
6.50
268.13
-6.50
- 268.13
1002
Concrete Technician OT (hourly
0.00
0.00
8,710.00
261.00
3,393.00
409.00
5,317.00
1003
Concrete Test Cylinders (each)
670.00
290.00
2.00
290.00
0.00
0.00
1500
Asphalt Extraction & Gradation
2.00
0.00
1.00
66.00
-1.00
-66.00
1502
Asphalt Maximum Theoretical
0.00
4.00
110.00
4.00
110.00
0.00
0.00
1601
2001
Asphalt Technician (hourly)
Soils Technician (hourly)
104.00
2,860.00
94.25
2,591.88
9.75
268.12
2005
In -Place Density Test (each)
148.00
1,924.00
111.00
1,443.00
26.00
37.00
-2.00
481.00
-26.00
2005R
In -Place Density Test (Retesti
0.00
0.00
156.00
2.00
16.00
208„00
-4.00
-52.00
2007
Pulverizations (each)
12.00
0.00
0.00
2.00
26.00
-2.00
-26.00
2008
Lime Depth Checks (each)
9.00
1,170.00
6.00
780.00
3.00
390.00
2010
Moisture Density Relationship
9.00
360.00
6.00
240.00
3.00
120.00
2020
7001
Atterberg Limits (each)
Transportation Charge (trip)
94.00
1,222.00
88.00
1,144.00
6.00
78.00
7001C
Transportation Charge (Trip) C
0.00
0.00
1.00
13.00
1,908.50
-1.00
-0.60
-13.00
-33.00
7002
Engineering & Report Review
34.10
1,875.50
34.70
0.30
16.50
-0.30
-16.50
7002C
Engineering and Report Review
0.00
0.00
Project totals:
29,677.50
16,710.89
12,966.61
$ 0 (f Coi*rqP �p
P1 Or
0000 O"Or C Ii*o1'��
i 4A 6-
717 e
Jul 11,02 2:18pm Page I