Gateway BP(1.4)-LR 960917HENLEY JOHNSTON ASSOCIATES, INC. engineeriig geoscience consultants PROJECT: HAVERTY'S DISTRIBUTION CENTER PROJECT No: CLIENT: HAVERTY'S FURNITURE CO. 1711. PIER INSPECTION FOUNDATION 2. CONCRETE INSPECTION 3. SUB SURFACE DRAIN INSTALLATION 4. SELECT FILL PLACEMENT 5. LIME STABILIZATION 6. FOOTING INSPECTION 7. GENERAL INSPECTION 8. REINFORCEMENT STEEL INSPECTION 9. TIE –BACK INSPECTION TECHNICIAN: fG�� ENGINEER: REPORT No.: telephone (214) 941 -3808 DAILY FIELD REPORT REPORT DATE: Q -/7- 94 HJA JOB No: 6641 TECHNICIAN: C, REVIEWED BY: BRIEF DESCRIPTION AND LOCATION: ,c da 4 o, /N s1,r�4.-7<i�r ,4 9 WEATHER: CAr� G 3 7/ TIME: START WORK: STOP WORK: 7,'o0 P,'3vs�M DELAYS: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK (X) APPROPRIATE RESPONSE ASTERISK REPONSE REQUIRES COMMENT. FIELD DENSITY TESTING CONCRETE CYUNDER PICK –UP GROUT CUBES FIELD GRADATION LIME FIELD REPORTS FIELD SAMPLING TENDON PROOF LOAD INSPECTION PIER INSPECTION RETENTION SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: /f Sc✓Yc O 7 'Lee, f ��i�+ ���i ✓.S. �as�ri� Lu .+a tom —j 3.,idiiLjirn,.� /YC `jo`Gs. .4/1/ t hi e- 12 L-, GY l 5 da !le V G SP G- tea? �s f t✓ry L G S f SHEET OF I F fax (214) 943- 7645 235 Morgan Ave., Dallas, Texas 75203 -1025 REMARKS I �l L• U c)••- <J '2� I �r I 'r -1 I C 41 C).• 17 �s '5 4 'FS a 'f S 's Z'E¢ •rb 1 4 'r 2 Ir 2 Z 41 El ao Z ST -4 'e b '5 I '/-J. in V\ M sfr H C a w a E+ UGHO• 1 a'6f g' /S g 0 L s' b O O'b£' d Z '2 4'7 Z 'L Mad a ,oau nn �■■m��■ 0/ 1 1 iff -Ca/ bS CT W 0 SiuvW32I a. tn 1 E7 U (n I fill f z 4c w a H o a r �rtb I' z 4c Z 6!s It f 11 r w- o rfI f d u...5•e 1/ I 1, 1 1 r+ w _-1 W aow--- 81' It It 11 1 Y"fr H a ww wO1-104. 1E v f 't£ 8//r 1 z ;f 1 5'2'E 1 f£ I -¢-7 I s'r i 1 0' REQ'D PEN (FT.) Z.P I I 1- ",11 1 b£7 I6.1 w 0 HENLEY JOHNSTON ASSOCIATES, INC. engineering geoscience consultants PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641 CONTRACTOR: HILL WILKINSON, INC. DATE: 9-ii -94- LOCATION: COPPELL, TEXAS SUPPLIER: J,4-• ,,,,,,,,4_ SAMPLE DATA SET 1 SET 2 TRUCK No. 14 1" TICKET No. 7•0Z 55.33 TIME BATCHED 3; Sl �m TIME SAMPLED .S,'z s'✓okl CONCRETE TEMP. 86 AIR CONTENT SET 2 LOCATION SET 1 LOCATION CONCRETE STRENGTH TESTS TECHNICIAN ENGINEER REPORT No. telephone (214) 941 -3808 O4I 7 C SHEET 4- OF 4- fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025 CYL. No. MIX SLUMP (in.) DATE PLACED DATE TESTED AGE days) TOTAL LOAD Ibs.) COMPR. STRENGTH psi C Z s /Z 1"--/i -9 9-7 -9G SY goo 3aa3 z SET 2 JP 1 S-9G z 3 //Z aoo 39G 3 1 I. B /.3Goo 90 /A HENLEY JOHNSTON ASSOCIATES, INC. engineering geoscience consultants PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641 CONTRACTOR: HILL WILKINSON, INC. DATE: 9-ii -94- LOCATION: COPPELL, TEXAS SUPPLIER: J,4-• ,,,,,,,,4_ SAMPLE DATA SET 1 SET 2 TRUCK No. 14 1" TICKET No. 7•0Z 55.33 TIME BATCHED 3; Sl �m TIME SAMPLED .S,'z s'✓okl CONCRETE TEMP. 86 AIR CONTENT SET 2 LOCATION SET 1 LOCATION CONCRETE STRENGTH TESTS TECHNICIAN ENGINEER REPORT No. telephone (214) 941 -3808 O4I 7 C SHEET 4- OF 4- fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025 CEMENT CONTENT Ibs.) FINE AGGR. lbs. COARSE AGGR. lbs. RATIO REQ'D 7 DAY (•si REQ'D 28 DAY •si ADMIX MIX DESIGN SET 1 3poa SET 2 HENLEY JOHNSTON ASSOCIATES, INC. engineering geoscience consultants PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641 CONTRACTOR: HILL WILKINSON, INC. DATE: 9-ii -94- LOCATION: COPPELL, TEXAS SUPPLIER: J,4-• ,,,,,,,,4_ SAMPLE DATA SET 1 SET 2 TRUCK No. 14 1" TICKET No. 7•0Z 55.33 TIME BATCHED 3; Sl �m TIME SAMPLED .S,'z s'✓okl CONCRETE TEMP. 86 AIR CONTENT SET 2 LOCATION SET 1 LOCATION CONCRETE STRENGTH TESTS TECHNICIAN ENGINEER REPORT No. telephone (214) 941 -3808 O4I 7 C SHEET 4- OF 4- fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025 HENLEY JOHNSTON ASSOCIATES, INC. engineerng geoscience consutta'ts PROJECT: HAVERTY'S DISTRIBUTION CENTER PROJECT No: CLIENT: HAVERTY'S FURNITURE CO. BRIEF DESCRIPTION AND LOCATION: WEATHER: 96_, TIME: START WORK: {Z; 3o Pril STOP WORK: DELAYS: TECHNICIAN: ENGINEER: REPORT No.: 1. PIER INSPECTION FOUNDATION 2. CONCRETE INSPECTION 3. SUB SURFACE DRAIN INSTALLATION 4. SELECT FILL PLACEMENT 5. LIME STABILIZATION 6. FOOTING INSPECTION 7. GENERAL INSPECTION 8. REINFORCEMENT STEEL INSPECTION 9. TIE —BACK INSPECTION S I3 �f� tis\c �a telephone (214) 941 -3808 fax (214) 943 -7645 DAILY FIELD REPORT REPORT DATE: 9 HJA JOB No: 6641 TECHNICIAN: J W S s -o-� REVIEWED BY: ;:t_ c_loo -e.1.c 44.4.5 o PM WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK (X) APPROPRIATE RESPONSE ASTERISK REPONSE REQUIRES COMMENT. 10. FIELD DENSITY TESTING 11. CONCRETE CYUNDER PICK —UP 12. GROUT CUBES 13. FIELD GRADATION LIME 14. FIELD REPORTS 15. FIELD SAMPLING 16. TENDON PROOF LOAD INSPECTION 17. PIER INSPECTION RETENTION 18. SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: v.,,. Q d y c s `a s e_ [00 dc; o C. S 1 SHEET OF 3 235 Morgan Ave., Dallas, Texas 75203 -1025 WEATHER: -1,, COMPACTION METHOD: REMARKS: t ,2 5 t o. Fl-/l_Lb 1 1 10 sti tiro“> ,--r-e A-lt 0-1"1 sic 5 w.¢A- ro'e c 3 c r z q v re- v- vt.e.-v -k S k :c 1.L ct.o.. s s Te s-* KC e Poo t 1 v o ro- -.f 1-.ti 1. 50- l o-`\ t z t o L o- L-c-i.,,_ TECHNICIAN ��0 1,,�„ --tr- ENGINEER REPORT No. HENLEY JOHNSTON ASSOCIATES, INC. engineerhg geoscience consultants PROJECT: HAVERTY'S CISIHIBUT1ON CENTER HJA JOB No.: 6641 CONTRACTOR: GILL EXCAVATING CO., INC. PROJECT No.: LOCATION: COPPELL, TEXAS DATE: R t-1 q to Dock FIELD (DENT No. V o0 Poo `z Poo 3 Poo Poo S FLo 4 Ft_ oz. FOL tD10 FL A:O 1 t LOCATION LAYER See o-� slc� 1 mot_ eo a -r4Y -r t.J a-Ti .-c- _z.d S1ca_V ska_. L J e 0-40.c_L a Sk.Q L S e_ �t t-L c s L-1 SA--Q_ a�E acd ska L LABORATORY DATA ASTM D 698 OPT MC 7-1.3 21, 3 21.3 2f.3 2_1.3 z1. STD DEN loot) too, loo. I z.1 loot co. I oo •t Ioo. t too. t oo,t Ioo, FIELD TEST DATA DENSITY: ASTM D 2922 MOISTURE: ASTM D 3017 DRY DEN (ocf) 100, 3 q 101. 1 00.13 RS 9l. S 95. 102 -.'I MC z1,S 1-3.1 22,9 z5• ?A. 20 DRY DEN 100, 9 8.4 to 1. 10 a g. c .4 2S. I 5.5 102,10 COMPLIES PROJECT SPECS. YES X X X NO PROJECT SPECIFICATIONS MOISTURE: RANGE FROM 0 TO 4 FROM OPTIMUM MOISTURE CONTENT DENSITY: MINIMUM 95 MAX. DRY DENSITY AT FUTURE PAVING BUILDING AREAS MINIMUM 90 MAX. DRY DENSITY AT LANDSCAPE AREAS telephone (214) 941 -3808 FIELD COMPACTION TESTS SHEET 2 OF 3 fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203-1025 z l 20 y 5 ec 3 /3