Gateway BP(1.4)-LR 960919PROJECT:
CLIENT: HAVERTY'S FURNITURE CO.
BRIEF DESCRIPTION AND LOCATION:
WEATHER: Ch er* ra. /n
TIME: START WORK
DELAYS:
WORK PERFORMED
THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION:
(CHECK (X) APPROPRIATE RESPONSE ASTERISK REPONSE REQUIRES COMMENT.
HENLEY
JOHNSTON
ASSOCIATES, INC.
engineering geoscience consuttants
PROJECT No:
1. PIER INSPECTION FOUNDATION 10.
CONCRETE INSPECTION �11.
3. SUB SURFACE DRAIN INSTALLATION 12.
4. SELECT FILL PLACEMENT 13.
5. LIME STABILIZATION 14.
6. FOOTING INSPECTION 15.
7. GENERAL INSPECTION 16.
8. REINFORCEMENT STEEL INSPECTION 17.
9. TIE —BACK INSPECTION 18.
REMARKS:
1 s to s a n i,y'd i;9-4 4- Lip /r. rays R 3 7 5": �3/ L
49 do !7 9 Wart "4„ 1 415 -le. 12/.1 n /,dNz_ e- 714- d oIN7 .1 .6‘4,
in way Gle Mc
wa w d L i 0 /f Ai/ o 7 2 e p��
TECHNICIAN:
ENGINEER:
REPORT No.: C9 5
telephone (214) 941 -3808
HAVERTY'S DISTRIBUTION CENTER
DAILY FIELD REPORT
REPORT DATE: q— /9- 9G
HJA JOB No: 6641
TECHNICIAN:
REVIEWED BY:
Lv
STOP WORK: 2,'oo,A7
d
FIELD DENSITY TESTING
CONCRETE CYLINDER PICK —UP
GROUT CUBES
FIELD GRADATION LIME
FIELD REPORTS
FIELD SAMPLING
TENDON PROOF LOAD INSPECTION
PIER INSPECTION RETENTION
SEE ATTACHED SHEETS FOR
TEST RESULTS
SHEET OF
fax (214) 943- 7645 235 Morgan Ave., Dallas, Texas 75203 -1025
HJA NO.: 6641
CZ�J WZ /Y .a2-3 A-4- Line
PROS T: Havertv's Distribution Center
?'1- )2
/lYl
DAILY F=.D REPORT
(CONTINUED)
even -k}; 7
L /�v
SG '2/ G //I GL C //Yl a5
Inspector
REPORT NO.: Q SD
ATE: 9 19- 9
A.em c 4
G
PAM Z of
4
HENLEY
JOHNSTON
ASSOCIATES, INC.
englneering geosdence consultants
S) [VWIU
CD 0
U
I -zz-
I
'O
i
w a
I2 `ts
b `6S
4 ilk
5'sE
s,
1
o't
f
1
iJ 6
1
1
s z.l
1 1
DEPTH
TO
START
PEN
MTL.
(FT.)
O o,
I I
r h 1
c2 '7
5NUI LVi
8
V
,c T II
15
O II
1
0 Ol II
TII
Lo
w
H N
a
o
0
H U
z w
O h H w o
z a
z
0
0
0
z
O
H
D
q
HENLEY
JOHNSTON
ASSOCIATES, INC.
engineering geoscience consultants
PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641
CONTRACTOR: HILL WILKINSON, INC. DATE: 9- ./9 9
LOCATION: COPPELL, TEXAS SUPPLIER: /zfi/;
TRUCK No.
TICKET No.
TIME BATCHED
TIME SAMPLED
CONCRETE TEMP.
AIR CONTENT
SET 2 LOCATION
TECHNICIAN
ENGINEER
REPORT No.
SAMPLE DATA
SET 1 LOCATION s B,z /3..3
6 e 69 ?3 2 5 a3 R9
telephone (214) 941 -3808
1-5
A✓,2 A/o•
8:
/via f /9-Al
79
6 C�
CONCRETE STRENGTH TESTS
SET 1 SET 2
SHEET 4- OF 4-
fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025
CYL.
No.
MIX
SLUMP
in.
DATE
PLACED
DATE
TESTED
AGE
(days
TOTAL
LOAD
(lbs.)
COMPR.
STRENGTH
psi
I
sv
_'//z-
1`' 19-9(-
9-2
)0-17-9e-
g
9Z Soo
//G A&
3zgz
4//7‘/
SET
l
v
z9
/4x210
4 /2 24
1
HENLEY
JOHNSTON
ASSOCIATES, INC.
engineering geoscience consultants
PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641
CONTRACTOR: HILL WILKINSON, INC. DATE: 9- ./9 9
LOCATION: COPPELL, TEXAS SUPPLIER: /zfi/;
TRUCK No.
TICKET No.
TIME BATCHED
TIME SAMPLED
CONCRETE TEMP.
AIR CONTENT
SET 2 LOCATION
TECHNICIAN
ENGINEER
REPORT No.
SAMPLE DATA
SET 1 LOCATION s B,z /3..3
6 e 69 ?3 2 5 a3 R9
telephone (214) 941 -3808
1-5
A✓,2 A/o•
8:
/via f /9-Al
79
6 C�
CONCRETE STRENGTH TESTS
SET 1 SET 2
SHEET 4- OF 4-
fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025
COARSE
AGGR.
lbs.
W/C
RATIO
gals sk)
REQ'D
7 DAY
(psi)
REQ'D
28 DAY
psi
ADMIX
MIX
DESIGN
CEMENT
CONTENT
lbs.
FINE
AGGR.
lbs.)
SET 1
3 Pao
SET
HENLEY
JOHNSTON
ASSOCIATES, INC.
engineering geoscience consultants
PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641
CONTRACTOR: HILL WILKINSON, INC. DATE: 9- ./9 9
LOCATION: COPPELL, TEXAS SUPPLIER: /zfi/;
TRUCK No.
TICKET No.
TIME BATCHED
TIME SAMPLED
CONCRETE TEMP.
AIR CONTENT
SET 2 LOCATION
TECHNICIAN
ENGINEER
REPORT No.
SAMPLE DATA
SET 1 LOCATION s B,z /3..3
6 e 69 ?3 2 5 a3 R9
telephone (214) 941 -3808
1-5
A✓,2 A/o•
8:
/via f /9-Al
79
6 C�
CONCRETE STRENGTH TESTS
SET 1 SET 2
SHEET 4- OF 4-
fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025