Gateway BP(1.4)-LR 960920PROJECT No:
HENLEY
JOHNSTON
ASSOCIATES, INC.
engineering geoscience consultants
PROJECT: HAVERTY'S DISTRIBUTION CENTER REPORT DATE: 9' 2. 0— 9
HJA JOB No: 6641
TECHNICIAN: e, C'r,„r 4 /4e: /G,
REVIEWED BY:
CLIENT: HAVERTY'S FURNITURE CO.
BRIEF DESCRIPTION AND LOCATION: /2/ 1,1
/1-e.
WEATHER: flip 1- 4 a I7 49
TIME: START WORK: Alec ('.'oo AM
DELAYS: 0.8/4 6;30
WORK. PERFORMED
THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION:
(CHECK (X) APPROPRIATE RESPONSE ASTERISK REPONSE REQUIRES COMMENT.
2.
3.
4.
5.
6.
7.
8.
9.
REMARKS: /16
33
/7? o I ./G L✓ 44e-el f�i/s (Lae
td in �r f/ /a,-
jv r �c-
TECHNICIAN:
ENGINEER:
REPORT No.:
PIER INSPECTION FOUNDATION
CONCRETE INSPECTION
SUB SURFACE DRAIN INSTALLATION
SELECT FILL PLACEMENT
LIME STABILIZATION
FOOTING INSPECTION
GENERAL INSPECTION
REINFORCEMENT STEEL INSPECTION
TIE —BACK INSPECTION
(25
telephone (214) 941 -3808 fax (214) 943 -7645
DAILY FIELD REPORT
STOP WORK: G;ov'
10. FIELD DENSITY TESTING
11. CONCRETE CYLINDER PICK —UP
12. GROUT CUBES
13. FIELD GRADATION LIME
14. FIELD REPORTS
15. FIELD SAMPLING
16. TENDON PROOF LOAD INSPECTION
17. PIER INSPECTION RETENTION
18. SEE ATTACHED SHEETS FOR
TEST RESULTS
1/ S. I o
l..05 /0 WAS S�/ T i7 -SAX
m> tfc s C/ /24
SHEET OF 3
235 Morgan Ave., Dallas, Texas 75203 -1025
1:4
0
w a
E Na
F a H F
O wa
F0ow
"E-24 w a F
w O H O t
F
a E-
w0FaFCL
w
H 0
a
r)
N
t M
4-
co
1
W
1
^'l
M
r1;
4 4
M M
N
c
^n cNk
CN
tvi
c()
M
N
r t
4.
cy, ►`1- p3
F
a
cn
0
N
b
0
in
H
C
z
0
H
F
w
a
is
In
w
F
0
S {UVW311
L.) U
f
51-
a
wa
H O 4
ad F C=.1
a
11':
11
8'$E
r�uisz�
4
It
11
O
ms
It
l
1' I
IL I I .4
4oa
o •'r
ob
1
o6
1
f1 '/E
a '67
A a/
6 'Or
emu.
o'l r I
o t�
I
I
1
ACTUAL DEPTH
PEN. TO
(FT.) START
PEN
MTL.
(FT.)
I
l e-'
J
1
t
O I
I
pf
l 1
£�7JI
£�Z II
11
1
II
0
W C7
H 2
a H
CLI
0
O r) H
W
xa
0
0
z
0
0
D
D
w
0
Cr)