Loading...
Gateway BP(1.4)-LR 960924BRIEF DESCRIPTION AND LOCATION: y r c Zr 7LP DELAYS: WORK. PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK (X) APPROPRIATE RESPONSE ASTERISK REPONSE REQUIRES COMMENT. c 1. PIER INSPECTION FOUNDATION '2. CONCRETE INSPECTION 3. SUB SURFACE DRAIN INSTALLATION HENLEY JOHNSTON ASSOCIATES, INC. engineerng geoscience consurtants PROJECT: HAVERTY'S DISTRIBUTION CENTER PROJECT No: CLIENT: HAVERTY'S FURNITURE CO. WEATHER: C /a, h �Ba 4 TIME: START WORK: cc 'po :3a Pm STOP WORK: p1/P/r! /Bt. TECHNICIAN: ENGINEER: REPORT No.: 4. SELECT FILL PLACEMENT 5. LIME STABILIZATION 6. FOOTING INSPECTION 7. GENERAL INSPECTION 8. REINFORCEMENT STEEL INSPECTION 9. TIE —BACK INSPECTION DAILY FIELD REPORT 10. FIELD DENSITY TESTING L----r11. CONCRETE CYLINDER PICK —UP 12. GROUT CUBES 13. FIELD GRADATION LIME 14. FIELD REPORTS 15. FIELD SAMPLING 16. TENDON PROOF LOAD INSPECTION 17. PIER INSPECTION RETENTION I-1 SEE ATTACHED SHEETS FOR TEST RESULTS REPORT DATE: 9 -.2¢- 94 HJA JOB No: 6641 TECHNICIAN: ye. REVIEWED BY: REMARKS: 2 4 -7,1 Z 7 s r 2,/,-„ S_ r� s /1, e 1 /e A MY ir„ A n /'i P S4- telephone (214) 941 -3808 fax (214) 943 -7645 /S/ 20/ a-,-, i✓ Z/ d i t SHEET OF 235 Morgan Ave., Dallas, Texas 75203 -1025 Sxi1VW lU I V- I Z L7 7 J c 1 fr J z 1 it o <7y a ss S l n v� 6 'o% 0"f l n I 1 l i v vy I I `-z 'S a'7 1 1 S 'E' ir a r �S f 0 I I irk 1J 'z� 1 I i s zc 1 I "h I °yT y'f n t1avr.tu x DEPTH TO START PEN MTL. (FT.) 1 I L I7 g 1 t i J L 7 as pia a �S S Z ca W H z H 0 E• i• U C 0 H W C C. 0 E• U E• O U a W C1 REMARKS 7 7 I L i i-- 1 In k.›.• 6' -I '_C/1 1 0 '766 I 5'16' ',61 Sh E s- C7 I a 11 El I i' s s "s-s '07 /h5I S'2 1 a M st 'NE 6 �1 'r6 1 t I 71 ZS� 62 _I 1 1 -t '7 S'£ Pci i 1 o'/,£' if I 1 I J LLI1 I U A t t/ Q 'Z� 2 ACTUAL PEN. (FT.) i l v i r I a'2 1 c'" I osZ 1 hb '_I 1 1 x..11 11 y tn H 8 5 r4 43 41 4 W L7 4 C7 C N z 0 H 7 G] w 0 REMARKS (CASING STICKUP (FT.) 7 1-1 M i- a 'rL R. 3 '12 h� 1, I I E.a0 uls,2 I 8'r� I� s I 11 W H t7.4 oa 'ti o an 0 '6 I ��r L�r�1 I 1 1 1 1 0 b 1 I Iltt V LsL\1 DEPTH TO START PEN MTL. (FT.) I S "7 0 6s f w I Imo 5- ('NI) i E a z 1 '1,,1 1, I it II Lo 0 o 0 U Ei 0 U H 0 o N en w w H zz o w E-0 v z <x 0 H E•4 z U to W 4 4 E1 z w< oo E• 0 CYL. No. MIX SLUMP in.) DATE PLACED DATE TESTED AGE (days) TOTAL LOAD lbs.) COMPR. STRENGTH psi 4/ z S 9 -1 96 /0— -94 9" 4170o 324/3 2 /a -iz -4/G 2� /390c yDZiS 1 1 1/97a0 yos MIX DESIGN CEMENT CONTENT (lbs.) FINE lbs. COARSE AGGR. (lbs.) O RATIO (gals sk) 7 DAY 7 DAY psi) 28 8 DAY psi ADMIX SET1 A" SET HENLEY JOHNSTON ASSOCIATES, INC. engineer'ng geoscience consultants PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641 CONTRACTOR: HILL WILKINSON, INC. DATE: 9-21 -9G LOCATION: COPPELL, TEXAS SUPPLIER: SAMPLE DATA TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 2 LOCATION TECHNICIAN ENGINEER REPORT No. telephone (214) 941 -3808 .2- 5 .Z rl a., i` .Z fo CONCRETE STRENGTH TESTS SET 2 SHEET C OF fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025