Loading...
Gateway BP(1.4)-LR 961010HENLEY JOHNSTON ASSOCIATES, INC. engineerng geoscience consultants PROJECT: HAVERTY'S DISTRIBUTION CENTER PROJECT No: CLIENT: HAVERTY'S FURNITURE CO. WEATHER: C�vdv 57 v- TIME: START WORK: ,Qi.7 DELAYS: V1. PIER INSPECTION FOUNDATION V1 CONCRETE INSPECTION 3. SUB SURFACE DRAIN INSTALLATION 4. SELECT FILLPLACEMENT 5. LIME STABILIZATION 6. FOOTING INSPECTION 7. GENERAL INSPECTION 8. REINFORCEMENT STEEL INSPECTION 9. TIE -BACK INSPECTION TECHNICIAN: ENGINEER: REPORT No.: telephone (214) 941 -3808 7 DAILY FIELD REPORT REPORT DATE: /p —/0--- 76 HJA JOB No: 6641 TECHNICIAN: e, REVIEWED BY: BRIEF DESCRIPTION d AND LOCATION: .o�,, �z i� sy�,_�>ir a., ('fir. ✓r _ti ///S/e� fii' STOP WORK: _6;w/is./ WORK. PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK (X) APPROPRIATE RESPONSE ASTERISK REPONSE REQUIRES COMMENT. 10. FIELD DENSITY TESTING +r11. CONCRETE CYLINDER PICK -UP 12. GROUT CUBES 13. FIELD GRADATION LIME 14. FIELD REPORTS 15. FIELD SAMPLING 16. TENDON PROOF LOAD INSPECTION 17. PIER INSPECTION RETENTION L-1 SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: d /9srr yr r/ Yuri j s tai o 4n-n i" A /ter s C v 57;79 ✓as sP f /a ni 7 7 1n 41 s. fl 9J ee l 2 s the e- 1/ /r0 F177 s 44 _S 7 7 e SHEET OF 3 fax (214) 943 7645 235 Morgan Ave., Dallas, Texas 75203 -1025 S)1UVW lU 1 1 1 'P. 1 -7561 G. E-. 1 s 1 E ti V �1 l I� /1 1 _•'2 I v E I —s I I viz g%E I g' -2 al O't 1 2 r 56� l 'sfz_ ACTUAL PEN. (FT.) J 7 1 I 7 1 1 11 1 I 4 z o? �z/ II c..' 0 O r Q U G:) wa H Ca O E CE O U W 0 N I N fl PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641 CONTRACTOR: HILL WILKINSON, INC. DATE: /a /U q�O LOCATION: COPPELL, TEXAS SUPPLIER: HENLEY JOHNSTON ASSOCIATES, INC. engineering geoscience consultants SAMPLE DATA TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 2 LOCATION TECHNICIAN ENGINEER REPORT No. telephone (214) 941 -3808 SET 1 SET 2 Z 0213 /,'43 1 '07 7 Ye CONCRETE STRENGTH TESTS SHEET 3 OF 3 fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025 CYL. No. MIX SLUMP (in.) DATE PLACED DATE TESTED AGE da s TOTAL LOAD lbs.) COMPR. STRENGTH psi c-2- 02._ 0 -/0-1G /P- 7I3a 3y SET 2 i, 9 PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641 CONTRACTOR: HILL WILKINSON, INC. DATE: /a /U q�O LOCATION: COPPELL, TEXAS SUPPLIER: HENLEY JOHNSTON ASSOCIATES, INC. engineering geoscience consultants SAMPLE DATA TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 2 LOCATION TECHNICIAN ENGINEER REPORT No. telephone (214) 941 -3808 SET 1 SET 2 Z 0213 /,'43 1 '07 7 Ye CONCRETE STRENGTH TESTS SHEET 3 OF 3 fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025 CEMENT CONTENT lbs.) FINE AGGR. lbs.) COARSE AGGR. lbs. W/C RATIO •als /sk REQ'D 7 DAY (psi) REQ'D 28 DAY psi ADMIX MIX DESIGN SET1 .)P/v SET 2 PROJECT: HAVERTY'S DISTRIBUTION CENTER JOB No.: 6641 CONTRACTOR: HILL WILKINSON, INC. DATE: /a /U q�O LOCATION: COPPELL, TEXAS SUPPLIER: HENLEY JOHNSTON ASSOCIATES, INC. engineering geoscience consultants SAMPLE DATA TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 2 LOCATION TECHNICIAN ENGINEER REPORT No. telephone (214) 941 -3808 SET 1 SET 2 Z 0213 /,'43 1 '07 7 Ye CONCRETE STRENGTH TESTS SHEET 3 OF 3 fax (214) 943 -7645 235 Morgan Ave., Dallas, Texas 75203 -1025