Gateway BP(1.4)-LR 961021PROJECT No:
HENLEY
JOHNSTON
ASSOCIATES, INC.
engineerng geoscience consultants
PROJECT: HAVERTY'S DISTRIBUTION CENTER
CLIENT: HAVERTY'S FURNITURE CO.
BRIEF DESCRIPTION AND LOCATION:
1
DAILY FIELD REPORT
REPORT DATE: AD-2A- 9 t
HJA JOB No: 6641
TECHNICIAN:
REVIEWED BY:
WEATHER: /rLI/✓ 1,7)Y7 Y9 7z
TIME: START WOR G,�o 7 9;3,0,0-x// -z,' ./STOP WORK: 30� z,vo %►y ,cv ,0
DELAYS: 304.- 306. 30z- 306 =04.
WORK, PERFORMED
THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION:
(CHECK (X) APPROPRIATE RESPONSE ASTERISK REPONSE REQUIRES COMMENT.
L- PIER INSPECTION FOUNDATION 10.
2. CONCRETE INSPECTION 11.
3. SUB SURFACE DRAIN INSTALLATION 12.
4. SELECT FILL PLACEMENT 13.
5. LIME STABILIZATION 14.
6. FOOTING INSPECTION 15.
7. GENERAL INSPECTION 16.
8. REINFORCEMENT STEEL INSPECTION 17.
9. TIE —BACK INSPECTION 18.
REMARKS:
TECHNICIAN:
ENGINEER:
REPORT No.:
telephone (214) 941 -3808
FIELD DENSITY TESTING
CONCRETE CYUNDER PICK —UP
GROUT CUBES
FIELD GRADATION LIME
FIELD REPORTS
FIELD SAMPLING
TENDON PROOF LOAD INSPECTION
PIER INSPECTION RETENTION
SEE ATTACHED SHEETS FOR
TEST RESULTS
0 .1 dz /7 F l/s
O /f ✓/4 /.e d /1 s is-7 iY 4 t C
i A 11 T` c?-7-1 Ya t i 1 "1-1-e---1-7 J I7.�/
i E f�r,i 'J lr ovate,
SHEET OF
fax (214) 943 7645 235 Morgan Ave., Dallas, Texas 75203 -1025