Loading...
Gateway BP(1.4)-LR 961022HENLEY JOHNSTON ASSOCIATES, INC. engineerng geoscience consultants PROJECT: HAVERTY'S DISTRIBUTION CENTER PROJECT No: CLIENT: HAVERTY'S FURNITURE CO. BRIEF DESCRIPTION AND LOCATION: WEATHER: s TIME: START WOR ip DELAYS: WORK. PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK (X) APPROPRIATE RESPONSE ASTERISK REPONSE REQUIRES COMMENT. V. PIER INSPECTION FOUNDATION 2. CONCRETE INSPECTION 3. SUB SURFACE DRAIN INSTALLATION 4. SELECT FILL PLACEMENT 5. LIME STABILIZATION 6. FOOTING INSPECTION 7. GENERAL INSPECTION 8. REINFORCEMENT STEEL INSPECTION 9. TIE —BACK INSPECTION REMARKS: TECHNICIAN: 7 ENGINEER: REPORT No.: 30 y telephone (214) 941 -3808 fax (214) 943 -7645 ryr -r e DAILY FIELD REPORT REPORT DATE: z- 96 HJA JOB No: 6641 TECHNICIAN: ,//ll REVIEWED BY: „STOP WORK: 30siiri/ /2 ,'3a,��f� ;ovril 10. FIELD DENSITY TESTING 11. CONCRETE CYUNDER PICK —UP 12. GROUT CUBES 13. FIELD GRADATION LIME FIELD REPORTS 15. FIELD SAMPLING 16. TENDON PROOF LOAD INSPECTION 17. PIER INSPECTION RETENTION 18. SEE ATTACHED SHEETS FOR TEST RESULTS )4, ,„0/ h!' 1 5 SHEET OF 235 Morgan Ave., Dallas, Texas 75203 -1025