Loading...
PA9702-LR 990915 (3)REPORT OF DAILY .F , LD ACTIVITIES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/10/1999 Report No.: 9924603 Report Date 09/15/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: CoppellAquatic/RecreationCtr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: Daily field activities. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for observation of daily field activities. The following was observed and/or inspected. The technician traveled to the project as scheduled to perform drilled belled pier inspection. Several problems were discovered and after a time, the installation of piers was postponed. Concrete as placed for a portion of the paving south of the rotunda and for certain columns. One sample of concrete was obtained, standard field tests were performed. One set of four compresslye strength test cylinders were cast, refer to Concrete Inspection Report #9924604, dated 09/10/99, for recorded data. Technician Time: 5:30 a.m. to 9:30 a.m. Technician: Lanney Ratcliff ~C ~ng, Inc. Report Distribution: ( I ) City of Coppeil ( 1 ) City of Coppell - Engineering ID (I) BrinkIcy Sargent A~hitects (1) City ofCoppell - Bldg. lnsp. Pau . Smith, P.E. (I) Turner Engineers (1) City ofCoppell - Leisure Serv Dept Senior Project Engineer (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, [no, 99SJ Pa~,e 1 of I