Loading...
SC-Coppell MSW-LR020717FUGRO SOUTH, INC. COMPRESSIVE 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 CLIENT: PROJ EC Cop ISD, c/o K A Sparks I BUD GTH OF CONCRETE REPORT A Middle School West, Coppell, Report Date July 17, 2002 Project No.: 0701 -2192 SAMPLE DATE: June 9, 2002 1 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc 188479 CONCRETE SUPPLIER: Hanson 91 PLANTITRUC K: 27/20 89 MIX ID NUMBER: 9349 10:44 AIR ( %) (ASTM C -231) : LOAD 11:29 WATER ADDED (gal): 10 Sunny SLUMP (in.) (ASTM C -143) : 5 Walkway E, approximately center of walkway (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 217 7 07/16/02 98830 3500 4000/28 days CMS 218 28 08/06/02 CMS 219 28 08/06/02 CMS 220 Hold Fracture mode is (A) unless otherwise noted Specifications: & ASTM C -31 ASTM Curing: M Testing ethods: ASTM C -39 Fracture: A® B® C Z D 0 REMARKS: Technician Zia Masumi Reviewed By: z7n�- SMH /rm Distribution K A Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc. - Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell - Coppell ISD - Mickey Harper SHW Group - Mike Elmore SHW Group - Dale Lilljedahl