Freeport NIP(7.9)-LR020715 (3) GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Uline Facility
Freeport Parkway
Coppell, Texas
REPORTED TO:
Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
REPORT NO. 47
REG PROJECT NO. 9056
SAMPLE DATE: 07-15-02
TECHNICIAN: F. Gomez
CONTRACTOR: Duke Construction
Location of Sample
Set Number I Location
1 Floor slab: A.5 to B and 5 to 5.4 30/530
2 Floor slab: B.5 to C and 6.6 to 7 120/530
3 Floor slab: C.5 to D and 5 to 5.4 230/530
4 Floor slab: D to D.5 and 6.6 to 7 320/530
5 Floor slab: F to F.5 and 6.6 to 7 450/530
6 Floor slab: G to G.5 and 5 to 5.4 530/530
Quantity Represented
Design Information
Source of Concrete I Mix Identification
TXI 47
Specified Strength p.s.i.
4000
Test Results
Set CylinderI [Age@ I Total Load Compressive
No. ID Date Tested Test lbs. Strength p.s.i.
1 1398 07-22-02 7 125870 4450
1398 08-12-02 28 158390 5610
1398 08-12-02 28 173870 6150
1398 Hold H
2 1399 O7-22-O2 7 118350 4190
1399 08-12-02 28 149880 5300
1399 08-12-02 28 143560 5080
1399 Hold H
3 1400 07-22-02 7 112370 3980
1400 08-12-02 28 141430 5010
1400 08-12-02 28 143970 5100
1400 Hold H
4 1401 07-22-02 7 96530 3420
1401 08-12-02 28 137350 4860
1401 08-12-02 28 135920 4810
1401 Hold H
Average
Strength p.s.i.
5880
5190
5O6O
484O
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
5 1402 07-22-02 7 103530 3660
1402 08-12-02 28 139990 4950
1402 08-12-02 28 134030 4740 4850
1402 Hold H
1403 07-22-02 7 102720 3640
1403 08-12-02 28 132430 4690
1403 08-12-02 28 125570 4440 4570
1403 Hold H
Cylinder Data
Set Cylinder Time of Concrete I Air I Ticket
No. ID Slump Sample Air Temp. Temp. I EntrainmentI Number
1 1398 4.50 3:30AM 76 86 N/A 3165689
2 1399 4.50 4:23AM 75 86 N/A 3165710
3 1400 5.00 5:35AM 75 84 N/A 3165732
4 1401 5.00 6:42AM 75 85 N/A 3165763
5 1402 5.00 8:32AM 76 86 N/A 3165919
6 1403 5.00 9:46AM 77 86 N/A 3166037
Mail
Distribution:
(1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je
GEOTECHNICAL AND ~ F~ r'"l U it==
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
~ Uline Facility
Freeport Parkway
Coppell, Texas
REPORTED TO:
Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
REPORT NO. 47
REG PROJECT NO. 9056
SAMPLE DATE: 07-15-02
TECHNICIAN: F. Gomez
CONTRACTOR: Duke Construction
Location of Sample
Set Number I Location I Quantity Represented
1 Floor slab: A.5 to B and 5 to 5.4 30/530
2 Floor slab: B.5 to C and 6.6 to 7 120/530
3 Floor slab: C.5 to D and 5 to 5.4 230/530
4 Floor slab: D to D.5 and 6.6 to 7 320/530
5 Floor slab: F to F.5 and 6.6 to 7 450/530
6 Floor slab: G to G.5 and 5 to 5.4 530/530
Design Information
Source of Concrete I Mix Identification
TXI 47
Specified Strength p.s.i.
40OO
Test Results
No. ID Date Tested Test lbs.I IStrength p.s.i. Strength p.s.i.
1 1398 07-22-02 7 125870 4450
1398 08-12-02 28
1398 08-12-02 28
1398 Hold H
2 1399 07-22-02 7 118350 4190
1399 08-12-02 28
1399 08-12-02 28
1399 Hold H
3 1400 07-22-02 7 112370 3980
1400 08-12-02 28
1400 08-12-02 28
1400 Hold H
4 1401 07-22-02 7 96530 3420
1401 08-12-02 28
1401 08-12-02 28
1401 Hold H ~4, .~i~
2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · ~AX [214] 350 0019
Set Cylinder
No. ID Date Tested
Age @ Total Load I Compressive Average
Test lbs.I Strength p.s.i. Strength p.s.i.
5 1402 07-22-02 7 103530 3660
1402 08-12-02 28
1402 08-12-02 28
1402 Hold H
6 1403 07-22-02 7 102720 3640
1403 08-12-02 28
1403 08-12-02 28
1403 Hold H
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 1398 4.50 3:30AM 76 86 N/A 3165689
2 1399 4.50 4:23AM 75 86 N/A 3165710
3 1400 5.00 5:35AM 75 84 N/A 3165732
4 1401 5.00 6:42AM 75 85 N/A 3165763
5 1402 5.00 8:32AM 76 86 N/A 3165919
6 1403 5.00 9:46AM 77 86 N/A 3166037
Mail
Distribution: (1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KEA/je