Loading...
Freeport NIP(7.9)-LR020715 (3) GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Uline Facility Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox REPORT NO. 47 REG PROJECT NO. 9056 SAMPLE DATE: 07-15-02 TECHNICIAN: F. Gomez CONTRACTOR: Duke Construction Location of Sample Set Number I Location 1 Floor slab: A.5 to B and 5 to 5.4 30/530 2 Floor slab: B.5 to C and 6.6 to 7 120/530 3 Floor slab: C.5 to D and 5 to 5.4 230/530 4 Floor slab: D to D.5 and 6.6 to 7 320/530 5 Floor slab: F to F.5 and 6.6 to 7 450/530 6 Floor slab: G to G.5 and 5 to 5.4 530/530 Quantity Represented Design Information Source of Concrete I Mix Identification TXI 47 Specified Strength p.s.i. 4000 Test Results Set CylinderI [Age@ I Total Load Compressive No. ID Date Tested Test lbs. Strength p.s.i. 1 1398 07-22-02 7 125870 4450 1398 08-12-02 28 158390 5610 1398 08-12-02 28 173870 6150 1398 Hold H 2 1399 O7-22-O2 7 118350 4190 1399 08-12-02 28 149880 5300 1399 08-12-02 28 143560 5080 1399 Hold H 3 1400 07-22-02 7 112370 3980 1400 08-12-02 28 141430 5010 1400 08-12-02 28 143970 5100 1400 Hold H 4 1401 07-22-02 7 96530 3420 1401 08-12-02 28 137350 4860 1401 08-12-02 28 135920 4810 1401 Hold H Average Strength p.s.i. 5880 5190 5O6O 484O 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019 No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 5 1402 07-22-02 7 103530 3660 1402 08-12-02 28 139990 4950 1402 08-12-02 28 134030 4740 4850 1402 Hold H 1403 07-22-02 7 102720 3640 1403 08-12-02 28 132430 4690 1403 08-12-02 28 125570 4440 4570 1403 Hold H Cylinder Data Set Cylinder Time of Concrete I Air I Ticket No. ID Slump Sample Air Temp. Temp. I EntrainmentI Number 1 1398 4.50 3:30AM 76 86 N/A 3165689 2 1399 4.50 4:23AM 75 86 N/A 3165710 3 1400 5.00 5:35AM 75 84 N/A 3165732 4 1401 5.00 6:42AM 75 85 N/A 3165763 5 1402 5.00 8:32AM 76 86 N/A 3165919 6 1403 5.00 9:46AM 77 86 N/A 3166037 Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je GEOTECHNICAL AND ~ F~ r'"l U it== ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT ~ Uline Facility Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox REPORT NO. 47 REG PROJECT NO. 9056 SAMPLE DATE: 07-15-02 TECHNICIAN: F. Gomez CONTRACTOR: Duke Construction Location of Sample Set Number I Location I Quantity Represented 1 Floor slab: A.5 to B and 5 to 5.4 30/530 2 Floor slab: B.5 to C and 6.6 to 7 120/530 3 Floor slab: C.5 to D and 5 to 5.4 230/530 4 Floor slab: D to D.5 and 6.6 to 7 320/530 5 Floor slab: F to F.5 and 6.6 to 7 450/530 6 Floor slab: G to G.5 and 5 to 5.4 530/530 Design Information Source of Concrete I Mix Identification TXI 47 Specified Strength p.s.i. 40OO Test Results No. ID Date Tested Test lbs.I IStrength p.s.i. Strength p.s.i. 1 1398 07-22-02 7 125870 4450 1398 08-12-02 28 1398 08-12-02 28 1398 Hold H 2 1399 07-22-02 7 118350 4190 1399 08-12-02 28 1399 08-12-02 28 1399 Hold H 3 1400 07-22-02 7 112370 3980 1400 08-12-02 28 1400 08-12-02 28 1400 Hold H 4 1401 07-22-02 7 96530 3420 1401 08-12-02 28 1401 08-12-02 28 1401 Hold H ~4, .~i~ 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · ~AX [214] 350 0019 Set Cylinder No. ID Date Tested Age @ Total Load I Compressive Average Test lbs.I Strength p.s.i. Strength p.s.i. 5 1402 07-22-02 7 103530 3660 1402 08-12-02 28 1402 08-12-02 28 1402 Hold H 6 1403 07-22-02 7 102720 3640 1403 08-12-02 28 1403 08-12-02 28 1403 Hold H Cylinder Data Set Cylinder Time of Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 1398 4.50 3:30AM 76 86 N/A 3165689 2 1399 4.50 4:23AM 75 86 N/A 3165710 3 1400 5.00 5:35AM 75 84 N/A 3165732 4 1401 5.00 6:42AM 75 85 N/A 3165763 5 1402 5.00 8:32AM 76 86 N/A 3165919 6 1403 5.00 9:46AM 77 86 N/A 3166037 Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je