Freeport NIP(7.9)-LR020710GEOTECHNICALAND ~ ~1 D I I ~
ENVIRONMENTAL CONSULTANTS
CONCRETE BEAM TEST REPORT
Uline Facility
Freeport Parkway
Coppell, Texas
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
REPORT NO. 37
REG PROJECT NO: 9056
SAMPLE DATE: 07-10-02
TECHNICIAN: F. Gomez
CONTRACTOR: Duke Construction
Location of Sample
Set Number I Location I Quanti~ Represented
1 Slab line A to A.5 from 2.7 to 3 40/590
2 Slab line C.7 to D.1 from 2.7 to 3 240/590
3 Slab line F.2 to F.7 from 2.7 to 3 450/590
Design Information
Source of
Set Number Concrete Mix Identification
Specified Strength p.s.i.
1 TXI 47 650-Flex
Test Results
Set Beam Date I Age@ Average Average Uncorrected Modulus
No. ID TestedI Test Width(in) Depth(in) Strength (psi) of Rupture(psi)
1 1233 07-17-02 7 6.06 6.06 720 700
1233 08-07-02 28 6.00 6.12 820 785
1233 08-07-02 28 6.06 6.12 805 765
1234 07-17-02 7 6.06 6.12 660 630
1234 08-07-02 28 6.00 6.25 825 760
1234 08-07-02 28 6.00 6.06 735 705
1235 07-17-02 7 6.06 6.06 750 730
1235 08-07-02 28 6.00 6.00 790 790
1235 08-07-02 28 6.00 6.06 865 830
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019
Beam Data
Set Beam I I Timeof
No. ID Slump Sample
Air
Temp.
1 1233 4.50 5:56AM 75
2 1234 5.00 8:03AM 79
3 1235 5.00 10:18AM 83
I C°ncrete I Air I Ticket
Temp. Entrainment Number
93 N/A 3162669
92 N/A 3162863
93 N/A 3163135
Mail
Distribution: (1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Osburn Contractors/
Mr. Collin LaFavors
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith Atkins
KENje
GEOTECHNICALAND G ~ I"1 I I ~
ENVIRONMENTAL CONSULTANTS
CONCRETE BEAM TEST REPORT
Uline Facility
Freeport Parkway
Coppell, Texas
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
REPORT NO. 37
REG PROJECT NO: 9056
SAMPLE DATE: 07-10-02
TECHNICIAN: F. Gomez
CONTRACTOR: Duke Construction
Location of Sample
Set Number I Location I Quantity Represented
1 Slab line A to A.5 from 2.7 to 3 40/590
2 Slab line C.7 to D.1 from 2.7 to 3 240/590
3 Slab line F.2 to F.7 from 2.7 to 3 450/590
Design Information
Source of
Set Number Concrete Mix Identification Specified Strength p.s.i.
1 T×I 47 650-Flex
Test Results
Set Beam Date Age @ Average Average Uncorrected Modulus
No. ID Tested Test Width (in) Depth (in) Strength (psi) of Rupture (psi)
1 1233 07-17-02 7 6.06 6.06 720 700
1233 08-07-02 28
1233 08-07-02 28
2 1234 07-17-02 7 606
1234 08-07-02 28
1234 08-07-02 28
3 1235 07-17-02 7 6.06
1235 08-07-02 28
1235 08-07-02 28
6.12 660 630
6.06 750 730
2424 STUTZ DR, · SUITE 400 ,, DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019
Beam Data
Set Beam Time of Air
No. ID Slump Sample Temp.
1 1233 4.50 5:56AM 75
2 1234 5.00 8:03AM 79
3 1235 5.00 10:18AM 83
Concrete Air I Ticket
Temp. Entrainmentt Number
93 n/a 3162669
92 N/A 3162863
93 N/A 3163135
Mail
Distribution: (1) Duke Realty Corporation/
Mr. Mike Cox
(1 Duke Realty Corporation/
Mr. Jeff Langston
(1 Pacheco Koch Consulting/
Mr. Jack Evans
(1 Haris Engineering, Inc./
Mr. Ali Haris
(1 Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1 City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(10sburn Contractors/
Mr. Collin LaFavors
Submitted by:
REED ENGINEERING GROUP, INC.
original Signed By
Keith Atkins
KENje