Loading...
Nash Manor-CS020730T H E C 1 T Y O F COPPE_ LL ~~~ _ ~Y~ ~ ~1i~ ~ r `~ ~ ~°/ O ~ E J~ 4 X A 5 ~ a July 30, 2002 Bill Koziol JR Holdings, Inc. 533 E. Sandy Lake Road Coppell, TX 75019 RE: Nash Manor Final Acceptance -Pending Dear Bill: Per the City of Coppell Subdivision Ordinance: Section 14, paragraph A, public improvements in development projects must be bonded for maintenance for a period of two years from the date of acceptance by the City. Paving, utilities and drainage structures are subject to this provision at a rate of 50% of the contract price, and must be issued by a reputable surety company. At this time, bonds for the utilities in Nash Drive and the cul-de-sac and the paving of the cul-de-sac are necessary. Bonding of the paving for Nash Drive will be required at the completion of that part of the project. An erosion control escrow must also be provided for residential subdivisions, subject to a two- year duration at 100% of the cost of erosion control measures installed. Please provide the applicable bonds and the escrow check for Nash Manor as soon as possible so that the project can be accepted in a timely manner. If you have any questions, please contact me at your convenience at (972) 304-7090. Sincerely, ~~ a~ Rick O'Dell Construction Inspector cc: Ken Griffin, Director of Engineering & Public Works Project File 255 PARKWAY * P. O.BO% 476 * COPPE LL TX 75019 * TEL 972/462 0022 # FA% 972/304 3673