Loading...
Amberpoint BP-CS020725~,~ ~~~~ ~~ T H E C 1 T Y O F MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, Director of Engineering ;iGlenn Hollowell, Asst. Director of Public Works 'Greg Jones, Chief Building Official /Travis Crump, Fire Marshal From: Larry Davis, Construction Inspectoro~~~ Office Phone: (972) 304-3684 Fax: (972) 304-3570 Date: July 25, 2002 RE: WALK-TH~RU for Amberpoint, Building One A final walk-thru for wing, utilities and drainage on the referenced project has been scheduled for ~ Please let me know if I can be of further assistance. cc: Lee Stone, Commercial Inspector I/Roland Asebedo, Asst. Fire Marshal VBrian Daigle, Hill & Wilkinson Ltd fax 214-299-4444 .. ~ g .,..~ "CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"