Loading...
ST0001-LR020729Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 8908 Ambassador Row Ro �� �� Dallas Te aS 75247 -4510 (214) 630 -9745 �' (214) 630A819 (fax) Report Date: CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 154640 Project No.: 015729 Date of Service: 07/18/2002 Report Date: 07/29/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi @, 28 Days SLUMP (in): 311 P MIX DESIGN I.D.: 38 PLACEMENT DATE: 07/18/2002 WEATHER CONDITIONS: Sunny TIME SAMPLED: 8:35am BATCH TIME: 7:36arn TEMPERATURE (F) -AIR 78 F CONCRETE: 83 F TRU NO: 834 TICKET NO: 3147849 AIR CONTENT ( % ): 3.5 UNIT WEIGHT (pcf): NA AIR ( %): 3% TEST METHOD: ASTM C-172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 OVERALL PLACEMENT LOCATION: Sidewalk from Station 16+00 through Station 18 +25 SAMPLE LOCATION: Station 17 +25 Report Distribution: (1) City of Coppell (1) City of Coppell (1) Infiastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. O1DK Page 1 of 1 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) s CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (Inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 5.75 07/25/2002 7 95185 3370 Unbonded Cap 1 2 5.75 07/25/2002 7 93195 3300 Unbonded Cap Average 3340 1 3 5.75 08/15/2002 28 Unbonded Cap 1 4 5.75 08/15/2002 28 Unbonded Cap 1 5 Hold Technician: Jarrod Miller Started: 7:30am Finished: 10:00am Ro s, c. Report Distribution: (1) City of Coppell (1) City of Coppell (1) Infiastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. O1DK Page 1 of 1 RoneEngineers Standard Counts Density Current: 3108 IN -PLACE DENSITY TESTING Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Project: Creekview Drive and Freeport arcway Coppell, TX Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA Report No.: 154626 Project No.: 015729 Date of Service: 07/18/2002 Report Date: 07/29/2002 CONTRACTOR: Infrastructure Services, Inc. Test Methods: ASTM D Gauge: Troxler -3430 Moisture -2922 ASTM D -3017 Gauge Serial No: 32685 Current: 674 Test Mode: DT Previous: 634 MOISTURE DENSITY RELATIONS Maximum MID No. Description Moisture % Density pcf I Dark Brown Clay, trace calcareous nodules 18.0 105.0 FIELD DENSITY TESTS 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630 -9819 (fax) Previous: 3010 Project Requirements Moisture Density Optimum +5 95 min TEST PROBE MID MOISTURE WET DENSITY DRY DENSITY NO TEST LOCATION DEPTH No. ( %) Oct) (pcf)' Sidewalk subgrade 1 Creekview sidewalk, station 11 +15 6" 1 21.7 123.6 Test results on this report meet project specification. Technician: Joe Jernigan Report Distribution: (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. Started: 3:00pm Finished: 5:00pm Cllr g **/ zi o 101.6 Manager DENSITY (% max) '7 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We atssunte no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control, Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers. Inc. 07CM Page I of 1 A LEIGH COMPANY 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630 -9819 (fax) IN -PLACE DENSITY TESTING Client: Infrastructure Services, Inc. Report No.: 154685 Attn: Mr. Phillip Bennett Project No.: 026186 PO Box 496448 Date of Service: 07/18/2002 Garland TX 75049 -6448 Report Date: 07/29/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler -3430 Moisture Density ASTM D -3017 Gauge Serial No: 32685 Current: 674 Current: 3108 Test Mode: DT Previous: 634 Previous: 3010 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Descriptio Moisture % Density pcf Moisture Density 1 Dark Brown Clay, trace calcareous nodules 18.0 105.0 Optimum +5 95 min TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY NO TEST LOCATION DEPTH No. ( %) (pc') (PC) Sidewalk subgrade 1 Creekview sidewalk, station 7 +67 6 1 19.0 121.5 102.1 Test results on this report meet project specification. Technician: Joe Jernigan Started: 5:30am Finished: 7:00am Rone En Report Distribution: (1) Infrastructure Services, Inc. (1) Infrastructure Services, Inc. 4 (1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. Clay S k (1) City of Coppell Project Manager (t) City of Coppell a 8 DENSITY (1%/ m LIMITATIONS! The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 07CM Page 1 of 1