Loading...
ST0001-LR0207258908 Ambassador Row Dallas, Texas 7524%4510 (214) 630-9745 (214) 630-9819 (faz) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dcpt PO Box 478 Coppell TX 75019 Report No.: 154518 ProjectNo.: 015729 DateofService: 07/17/2002 ReportDate: 07/25/2002 Coppell, TX Obtain samples of fresh conc~e at the placement locations, pcrform required field testing, cast compressive strength samples and bring samples back to thc laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTrACtOR: ~cture Services, Iac. CONCRETE SUPPLIER: Latfimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEMENT DA'I~: WEATHER CONBITIONS: TIME SAMPLED: 6:50am TEMPERATURE (F) - AIR T~UCK NO: 1042 AIR CONTENT (%): 3.5 07/17/2002 Cloudy BATCH TIME: 6:06am 74 r CONC~TE: 80 ~* TICmgT NO: 7118709 UNIT WEIGHT (pc0: NA OVERALL PLACElVl~NT LOCATION: Median on State St. SAMPLE LOCATION: Station 36+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. for~e) (psi) TYPE 1 1 5.25 ~07/20/2002 3 82655 1 2 5.25 07/24/2002 7 98085 I 3 5.25 08/14/2002 28 1 4 5.25 08/14/2002 28 .~d~/~bonded Cap ~'~ 3470~bonded Cap ~ Unbonded Cap Unbondcd Cap 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 of 4 Report No.: 154518 Project No.: 015729 Client: City of CoppeH RoneEngineers Water added at site: 10 gallons See report #154517 for technician time. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 2 of 4 .RoneEngineem 8908 Ambassador Row l)allns~ Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 154518 Project No.: 015729 Date of Service: 07/17/2002 Report Date: 07/25/2002 Project: Services: Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samplea back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA SLUMP On): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days 3" o 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 PLACEP, mNT DATE: 07/17/2002 WEATHER CONDmONS: Cloudy TIME SAMPLED: 7:05ai11 BATCH TIME: 6:16~ ~E~-Am 76 ~ CONC~TE: 84 raUC~ ~O: 1093 r~C~T nO: 711871 AIR CO~ (%): 3.8 UN~ WEIG~ ~e0: NA O~LL P~CE~ LOCATION: Sid~lk on C~i~ ~m S~fion 15~0 ~u~ S~fion 16~ SAMPLE LOCATION: Station 15+42 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARleD SLUMP DATE AGE LOAD STRENGTH FRACTUILE SET NO. 0nches) TESTED (d~ys) Obs. force) (.mi) TYPE 2 1 5.25 07/20/2002 3 81920 2900 Unbondcd Cap 2 2 5.25 07/24/2002 7 100175 3540 Unbonded Cap 2 3 5.25 08/14/2002 28 Unbonded Cap 2 4 5.25 08/14/2002 28 Unbonded Cap 2 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and ~ports are for thc exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Ronc Engineers, Inc. 01DK Page 3 of 4 Report No.: 154518 Project No.: 015729 Client: City of Copp¢ll RoneEngineers See report ~154517 for technician time. Technician: Sarrod Miller Report Distribution: (i) City of Coppell (l) City of Coppdl (1) Infrasmactur~ Services, Inc. (1) Schrickcl, Rollins & Assoc., Inc. Started: Finished: Cla] tStark Projecl Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conti'ol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 4 of 4 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (9-14) 6309745 (214) 6309819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City ofCoppell Atm:Ms. SusanTaylor-Engineering Dept PO Box 478 CoppeHTX75019 Report No.: 154517 Project No.: 015729 Date of Service: 07/17/2002 Report Date: 07/25/2002 Creekview Drive and Freepox~ Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for caring and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: co~iTn~crou: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-I064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 Pt,~CEM~NT DATE: 07/17/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 6:30am BATCH TIME: 5 :J,~nrn TEMPE~Oq-mR 74 F CONCRETE: 81 F X~UCK NO: 757 TICr.~T NO: 7118705 AIR CONTENT (%): 3.0 UNIT WEIGHT (pc/): NA OVERALL PLACEMENT LOCATION: Paving on State St. SAMPLE LOCATION: Station 32+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED - SLUMP SET NO. 0nehes) MAXIMUM DATE AGE LOAD TESTED (day0 Obs. force) COMPRESSIVE STRENGTH FRACTURE (ps0 TYPE 1 1 4.25 07/20/2002 3 104095 3680 UnbondeACap 1 2 4.25 07/24/2002 7 114570 4050 UnbondedCap 1 3 4.25 1 4 4.25 1 5 Technician: Jarrod Miller Report Distribution: ( 1 ) City of Coppcll (1) City of Coppell (1) InfrasWacture Services, inc. (1) Schrickel, Rollins & Assoc., Inc. 08/14/2002 28 08/14/2002 28 Unbonded Cap Unbonded Cap Hold Started: 5:30am Finished: 8:15a~ LIMITATIONS: Thc test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 of 1 gineers 8908 Ambassador Row 121 N6~h Rayner Dallas, Texas 75247 Fort Worth, Texas 76111 (214) 630-9745 (817) 831-6211 Client: Project: Contractor: Density: ASTM D-2922 Moisture: ASTM D-3017 Density Standard Counts Current: Density Standard Counts Previous: Test Mode (DT / BS): f') T' In-Place Density Service Order Report No.: Project No.: Date of Service: Page I Requirements Gauge Manuf. & Model: Troxler Gauge Serial No.: 2 ) b: f, Moisture Standard Counts Current: Moisture Standard Counts Previous: Probe Depth: 0, 2, 4, ~ 8, 10, Moisture / Densi ,ty Relations M/D Test Report Material No.: of Number Description 1 .)</.o,dl ,,. ,lc ,,, .... 2 3 In-Place Density, Test Results Test Test M/D No. Location No. Optimum Maximum Moisture Density Remarks: MC Moisture Content DC /cLX. % 2 ~ ~ lbs '),1. I % Iba % lbs % lbs % lbs Density Percent pcf Compaction, l :q. / wet qq.q a~y q4. l % wet dry % dry wet d~y % wet dry % lbs wet % dry % lbs wet % dry % Time Start: : :~P: