Loading...
Villages C P3&4-CS 910211plea, se ct rcdrt �� aIr P a,-c-K Wle j COPPELL PUBLIC WORKS &/_ _ /� to MEMORANDUM Z I - 1 I L p6V y l e, w.,5 "� '� �� (k Cv February 11, 1991 TO: Taryon Bowman, Planning & Zoning Coordinator FROM: Shohre Daneshmand, Acting City Engineer RE: Final Plat; Villages of Coppell Phase III We have reviewed the engineering plans for Villages of Coppell Phase III as submitted to our office for general conformance to the City of Coppell Subdivision ordinance and Standards. The following are our comments: Minimum horizontal curvature per Subdivision Ordinance is 425 feet. Provide a formal request for variance to the Subdivision Ordinance. The recommended horizontal curvature, per the latest Thoroughfare Plan, is 300 feet. Minimum pavement width for a C2U (60' R.O.W.) such as Allen Road is 40 feet. The C factor must be 0.65 and the rainfall intensity I be 11.6 for 10 minutes. If Tc - 15 minutes is used, please provide justification and analysis. - Provide an off -site drainage area map, scale 1" = 200' or 300' ... etc. - Provide a design plan for an enclosed drainage system to handle off -site drainage from north side of Deforest Road. - Provide erosion control plan. - Show limits of 100 year floodplain and floodway on the final plat and drainage area map. - All provisions of the floodplain ordinance #87390 and the newly adopted city -wide storm water master plan must be complied with. We recommend that there be no loss in valley storage. - Appropriate development fees must be paid - SEE ATTACHED - Provide a written response on all comments with explanations provided on items not addressed as requested by staff. - A set of marked up plans and Public Works comments have already been provided to Don Tipton Engineering for correction. We have no objection to this project as long as all above comments are addressed. MSD /sm cc: Steven Goram, Director of Public Works Ben dela Cruz, Engineer Technician Public Works DRC Members Pat Atkins, Don Tipton Engineering