Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Freeport NIP(7.9)-LR020725 (4)
F:;I E E 'r-~ I GEOTECHNICAL AND ENVI P,O NHENTAL CONSULTANTS REPORT OF PIER OBSERVATION Uline Facility Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 A'I-I'N: Mr. Mike Cox CONTRACTOR: Duke Construction REPORT NO. 21 REPORT DATE: 07-25-02 REG PROJECT NO. 9056 TECHNICIAN: S. Davis PAGE: 1 of 1 IFinal Depth Concrete of Pier (feet) Length (feet) Date 07-08-02 Pier Diameter Bell Diameter Depth Before Pier No. (nches) (inches) Bell (feet) ^-3.9 24 54 13.0 A.6-9 24 54 13.3 A.9-9 24 54 13.0 B.5-9 24 66 13.4 C.5-6 24 66 13.0 D.5-9 24 66 13.3 E.5-9 24 66 13.3 F.5-9 24 66 13.4 G.5-6 24 66 13.0 H-8.7 24 66 13.3 H-8.4 24 66 13.2 H-8 24 66 13.0 H-7.3 24 66 13.0 H-7.4 24 66 13.2 H -7 24 66 13.1 H-6.7 24 66 13.4 H-6.4 24 66 13.0 J-5.3 20 42 13.5 J-4.6 20 42 13.8 13.3 12.7 13.3 12.7 13.2 12.6 13.4 12.8 13.0 12.4 13.3 12.7 13.3 12.7 13.4 12.8 13.0 12.4 13.3 12.7 13.4 12.8 13.4 12.8 13.3 12.7 13.2 12.6 13.1 12.5 13.6 13.0 13.1 12.5 13.8 13.2 14.0 13.4 Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) Osburn Contractors/ Mr. Collin LaFavors (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. AE/cn 2424 STUTZ DR. · SUITE 400., DALLAS, TX 75235 · TEL [214] 350 5600" FAX [214] 350 0019