Loading...
Vistas of C P2-LR 970721F'UGRO-McCLELLAND (SOUTHWEST), INC. 28,80 V~rGo i. adO; Da",as Texar, 7.5229 pn (.972) 4B4-B3;I; ~a~ (972) COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: centex Homes Report Date: July 21, PROJECT: vistas of Coppeil, Phase lA & 2B, Coppell, Texas Project No,: 0771-2024 CONTRACTOR: Glenn Thurman, Inc. TICKET NO.: N/A AMBIENT TEMP. (°F): 87 CONCRETE TEMP. (°F): 88 TIME BATCHED: 10;5o am TIME SAMPLED: 11:10 am WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE SUPPLIER: GTi PLANT/TRUCK: On site MiX ID NUMBER: N/A AIR (%) (ASTM C.Z31) N/A WATER ADDED (gal): 0 1 1/2 Clear SLUMP (inches) tASTM C-1~} Paving: Jogging and bicycle trail, station 11+90 CYLINDER AGE I DATE TOTAL LOAD ] COMPRESSIVE I REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) i STRENGTH i STRENGTH {psi) (psi) VOC 140 7 07/Z2/97 Removed from ]obsite by unknown 3000/28 days VOC 141 28 08112/97 Removed from jobsite by unknown I 08/12/97 Removed from jobsite b~/unknown VOC 142 28 I ~ VOC 143 Hold I Removed ~ -- ~nS: MaK~ & Curin ' ASTM C-31 testin.~.Methods: ASTN' C-143. ASTM C-39 REMARKS: Technician: Jason Brimingham FUGRO-McCLELLAND (SOUTHWEST), INC. Checked BY4-._~q/ SMH/rm Distribution: Centex Homes - Derek Earle Glenn Thurrnan, Ir~c. City of Coppell - Garreth Campbell