Loading...
Vistas of C P2-LR 970815FUGRO-McCLELLAND (SOUTHWEST), INC. 28B0 Virgo Lano; D~,ll~s. 'rexes 75;~29 Pi-, [972) 484-83~1; Fax (972) 620-73~8 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: August 15, 1997 PROJECT: Vistas of Coppell, Phase lA & 2B, Coppell, Texas project No.: o771-2024 CONTRACTOR: Glenn Thu~nan, Inc. TICKET NO.= NIA AMBIENT TEMP. (°F); 95 CONCRETE TEMP. (°F): 91 TIME BATCHED: 2:00 pm TIME SAMPLED: 2:10 pm WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Glenn ThurTnan pLANT/TRUCK: On Site MIX ID NUMBER: N/A AIR (%) {ASTM C.231) 5.2 WATER ADDED {gal): 0 2 Clear SLUMP (inches) [ASTM C-143) Paving: Jogging and bicycle trail, station 3+25 CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE I REQUIRED COMPRE. SSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH VOC 144 VOC 145 VOC 145 VOC 147 Speci,~ca'Jons: 7 28 28 Hold Ma~ng & Cudn~J: 07/22/97 08/12./97 08,/12./97 105500 127000 130000 3731 4492 4598 3000128 da'~s AsTM C-31 T~,s~ln~ Methods: ASTM C-143, ASTM C-39 REMARI~S: Technician: SMH/mv Distribution: Michael Overslreet Centex Homes - Derek, Eade Glenn Thurmsn, Inc. City of Coppell - Garreth Campbell FUGRO-McCLELLAND (SOUTHWEST), INC. Checked BT:'~--~ ~"