Loading...
Freeport NIP(7.9)-LR020724 (2)F=Im'E]/~ J m-I--Ir-~ II-I1=' I='F:llrlr~ GEOTECHNICAL AND [:~ j==J r-i I I p ENVlP, ONFJ ENTA/ CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Uline Facility Freeport Parkway Coppell, Texas Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction Location of Sample I Set Number I Location 1 Panel # 6 2 Panel # 9 3 Panel # 12 REPORT NO. 53 REG PROJECT NO. 9056 SAMPLE DATE: 07-24-02 TECHNICIAN: D. Rico J Quantity Represented 70/270 140/270 270/270 Design Information Source of Concrete TXI Mix Identification Specified Strength p.s.i. 47 4OOO Test Results Set Cylinder I Age @ No. ID J Date Tested Test 1 1744 07-31-02 7 1744 08-21-02 28 1744 08-21-02 28 1744 Hold H 2 1745 07-31-02 7 1745 08-21-02 28 1745 08-21-02 28 1745 Hold H TotalLoad Compressive Average lbs. Strength p.s.i. Strength p.s.i. 105310 373O 133460 4720 135280 4790 4760 109660 3880 135990 4810 136570 4830 4820 3 1746 07-31-02 7 78100 2760 1746 08-21-02 28 115370 4080 1746 08-21-02 28 117860 4170 4130 1746 Hold H 2424STUTZ DR. * SUITE 400 * DALLAS, TX 75235 · TEL [214] 3505600 · F^X [214] 3500019 Cylinder Data Set Cylinder INo. I ID I i 1744 1745 1746 Slump I Time of Sample 4.50 5:05AM 4.50 6:40AM 5.00 8:45AM I AirTemp. I Concrete I Air Ticket Temp. I Entrainment Number 90 N/A 3172780 90 N/A 3172827 90 N/A 3173030 77 77 84 Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Osburn Contractors/ Mr. Collin LaFavors Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je GEOTECHNICALAND ~ ~ I~ I I F~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Uline Facility Freeport Parkway Coppell, Texas REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction REPORT NO. 53 REG PROJECT NO. 9056 SAMPLE DATE: 07-24-02 TECHNICIAN: D. Rico Location of Sample Set Number I Location I Quantity Represented 1 Panel # 6 70/270 2 Panel # 9 140/270 3 Panel # 12 270/270 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. TXI 47 4000 Test Results Set Cylinder Age @ Total Load No. ID Date Tested Test lbs. 1 1744 07-31-02 7 105310 3730 1744 08-21-02 28 1744 08-21-02 28 1744 Hold H 2 1745 07-31-02 7 109660 3880 1745 08-21-02 28 1745 08-21-02 28 1745 Hold H 3 1746 07-31-02 7 78100 2760 1746 08-21-02 28 1746 08-21-02 28 1746 Hold H Compressive I Average Strength p.s.i. Strength p.s.i. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data Set Cylinder Time of No. ID Slump Sample Entrainment Number 1 1744 4.50 5:05AM 2 1745 4.50 6:40AM 3 1748 5.00 8:45AM r AirTemp. I Temp. 77 90 77 90 84 90 N/A 3172780 N/A 3172827 N/^ 3173030 Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn-Chandler-Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Osburn Contractors/ Mr. Collin LaFavors Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je