SC-Coppell MSW-LR020729 ~~"'~ ~ ~ 2880 Virgo Lane; Dallas, Texas 75229
FUGRO
SOUTH,
INC.
Ph (972) 484-8301; Fax (972) 820-7328
OBSERVATION OF C NCRETE PLACEMENT
CLIENT: Coppell lSD, c/o K A Sparks ~'~ REPORT DATE: July 29, 2002
PROJECT:~ PROJECT NO: 0701-2192
DATE PERFORMED: July 26, 2002 I
General Contractor: Cortez Group Inc.
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Paving on Wrangler Circle
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
4:OO
11:00
2OO
4-1/2 to 5-1/2
5
Hanson - Plant No. 27
78 - 89°F
7/28
8
No
Julio Villarreal
Fugro South Technician
SMH/bg
Distribution:
FUGRO SOUTH, INC.
Reviewed By: "~"~' "~\ '
K A Sparks Contractors Inc, - Jim Schooler
K A Sparks Contractors Inc. - Jerry Jones (Fax: 972-393-1228)
City of Coppell - Lee Stone
City of Coppell - Garreth CampbelP""-"
Coppell lSD - Mickey Harper
SHW Group - Mike Elmore
SHW Group - Dale Lilljedahl
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
REINFORCING STEEL PLACEMENT OBSERVATION
CLIENT: Coppell lSD, cio K A Sparks REPORT DATE: July 29, 2002
PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0701-2192
DATE PERFORMED: July 26, 2002
General Contractor: Cortez Group inc.
Method of Test: Applicable ACl Recommendations and ASTM Standards
Results / Remarks:
On the above sample date, a representative of Fugro South observed the reinforcing steel placed at the following
location:
· Wrangler Circle and parking lot next to Building "A".
The steel was checked for proper size, grade, quantity, vertical location, horizontal spacing, correctness of
bends and splices, firmness and security of support and ties and clearances between reinforcement and forms.
No discrepancies were noted this date.
Julio Villarreal
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By:
SMH/bg
Distribution:
K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Jerry Jones (Fax: 972-393-1228)
City of Coppell - Lee Stone
City of Coppell - Garreth Campbell
Coppell lSD - Mickey Harper
SHW Group - Mike EImore
SHW Group - Dale Lilljedahl
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
CLIENT:
PROJECT:
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o K A Sparks REPORT DATE: July 29, 2002
Coppell Middle School West, Coppell, Texas PROJECT NO: 0701-2192
DATE PERFORMED: July 25, 2002
General Contractor: Cortez Group
Method of Test: Applicable ACl Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Paving at firelane and bus drop-off and pick-up
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
3:30
11:30
250
5.0 to 6.0
5.0
Hanson - Plant No. 27
.°F
4000/28
12
No
Julio Perez
Fugro South Technician
SMH/bg
Distribution:
FUGRO SOUTH, INC.
Reviewed By:
K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Jerry Jones (Fax: 972-393-1228)
City of Coppell - Lee Stone
City of Coppell - Garreth Campbell
Coppell lSD - Mickey Harper
SHW Group - Mike Elmore
SHW Group - Dale Lilljedahl