SC-Coppell MSW-LR020718FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620~7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: July 18, 2002 PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0701-2192 DATE PERFORMED: July 17, 2002 Contractors on Site: K.A. Sparks Remarks: Pulverization/Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Percent Location Passing 1 3/4" Passing #4 Sieve ¢) Sieve ¢) 1 450 feet south off Wrangler Drive on 100 82 Wrangler Circle 2 50 feet south off Wrangler Drive on 100 82 Wrangler Circle -- (2) Project Requirementu: Minimum 100% Minimum 60% (2) At roadway moisture condition. Item 4.6 of Standard Specifications for Public Works Construction of North Central Texas Council of Governments, 1993 Edition. Dan Gazley Fugro South Technician FUGRO SOUTH, INC. Reviewed By:. SMH/bg Distribution: K A Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc. - Jerry Jones (Fax: 972-393-1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell lSD - Mickey Harper SHW Group - Mike Elmore SHW Group - Dale Lilljedahl FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Coppell lSD, c/o K A Sparks Coppell Middle School West, Coppell, Texas Report Date: July 18, 2002 Project No.: 0701-2192 DATE PERFORMED: July 17, 2002 Density Test Method: ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Number Description 1 Dark brown clay TEST PROCTOR NO. NO. 25 1 26 1 27 1 28 1 29 1 30 1 LOCATION 60 feet west off of Western Circle, south side, final 100 feet west off of Western Circle on south side, final 80 feet west off Western Circle on north side, final 30 feet west off Western Circle on north side, final Retest #25 dated 7-17-02 Retest #26 dated 7-17-02 Method of Compaction: ASTM D-698 Proctor Results Maximum Dry Density (pcf) Optimum Moisture (%) 97.3 23.4 TEST RESULTS UNIT DRY MOISTURE PERCENT OF WEIGHT CONTENT PERCENT MAXIMUM DENSITY 88.7 23.3 91.2** 84.8 27.3 87.1 ** 96.0 23.9 98.6 93.0 26.9 95.5 94.4 23.2 97.0 94.0 26.5 96.6 Remarks: **Does not meet project specifications for compaction. Dan Gazley Fugro South Technician FUGRO SOUTH INC. Reviewed By: SMH/bg Distribution: K A Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc.- Jerry Jones (Fax: 972-393-1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell lSD - Mickey Harper SHW Group - Mike EImore SHW Group - Dale Lilljedahl FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: July 18, 2002 PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0701-2192 DATE PERFORMED: July '17, 2002 Contractors on Site: Remarks: Pulverization/Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Percent Location Passing 1 3/4" Passing #4 Sieve ¢) Sieve ¢) 1 Bus Pickup and Drop-off, south side, 100 10 feet from end 2 Bus Pickup and Drop-off, north side, 100 15 feet from end 3 Bus Pickup and Drop-off at center 100 4 Retest on south side, 5 feet from end 100 5 Retest on north side, 10 feet from end 100 Minimum 100% Project Requirements: (2) 61 51 70 71 70 Minimum 60% (1) (2) At roadway moisture condition. Item 4.6 of Standard Specifications for Public Works Construction of North Central Texas Council of Governments, 1993 Edition. Julio Perez Fugro South Technician SMH/bg Distribution: FUGRO SOUTH, INC. Reviewed By:. K A Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc. - Jerry Jones (Fax: 972-393-1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell lSD - Mickey Harper SHW Group - Mike Elmore SHW Group - Dale Lilljedahl