Loading...
ST0001-LR0208078908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-97,15 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 155725 Project No.: 015729 Date of Service: 07/30/2002 Report Date: 08/07/2002 Project: Services: Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratow for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days SLUMP (in): Y' - 5" AIR (%): 3% - 6% TEST METHOD: ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 MIX DESIGN I.D.: 38 PLACEMENT DATE: 07/30/2002 WEATHER CONDITIONS: Clear TIME SAMPLED: 3' 1 Opm BATCH XIME: 2:07pm TEMPERATURE (F) - A/R 88 V CONCREX~: 92 V TRUCKNO: 830 TlCrd~TNO: 3148576 AIR CONTENT (%): 5.0 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: I light pole at Station 13+50 SAMPLE LOCATION: Same as above ASTM C-39 REPORT OF TEgT,g Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 ! 4.5 08/06/2002 7 108635 3840 Unbonded Cap 1 2 4.5 08/27/2002 28 1 3 4.5 08/27/2002 28 Unbonded Cap Unbonded Cap 1 4 Hold Water added at site: 3 gallons Technician: Jason Kale Report Distribution: (1) City of Coppell (1) City of Coppell (I) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. Started: l:30pm Finished: 3:30pm Clay s Project Manager LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 ofl Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 155226 Project No.: 015729 Date of Service: 07/25/2002 Report Date: 08/07/2002 Creekview Drive and '~ Freeport Parkway~ // Coppell, TX ~ Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Latfimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 3000 psi ~ 28 Days SLUMP (in): 3" - 5" AIR (%): 3% - 5% TEST METHOD: ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 MIX DESIGN I.D.: 38 PLACEMENT OATE: 07/25/2002 - WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 6:42am BATCHTIME: 5:08am TEMPERATURE (F) - AIR 78 F CONCRETE: 85 F TRUCK NO: 821 TICKET NO: 3148287 AIR CONTENT (%): 3.5 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Sidewalk SAMPLE LOCATION: Station 23+75 ASTM C-39 REPORT OF TE,qT~q Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MARKED SET NO. 1 1 MEASURED MAXIMUM SLUMP DATE AGE~ LOAD (inches) TESTED (~ (lbs. force) 6.5 08/01/2002 ~ 7 76825 08/22/2002 C,~ 28 08/22/2002 28 6.5 6.5 1 4 Hold Water added at site: 5 gallons Technician: Jun Germer Report Distribution: (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. Started: 7:00am COMPRESSIVE STRENGTH FRACTURE ~/ Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rune Engineers, Inc. 01DK Page 1 of I Finished: 7:30am~ * ~R°/~~e~l ~" .~l~l&(~? Clay ark Project Manager R°neEngineers Client: City of Coppell Arm: Ms. Susan Taylor- Engineering Dept PO Box 478 Coppell TX 75019 Project: Cr~kvi~w Drive and Fro~-port Parkway Coppoll, TX Services: Cylinder Collection 89~ Ambnssad~r l~w ~ T~xa~ 7~247-4fl10 (2~4) 630-974~ (214) 63~-~19 (f~x) REPORT OF CYLINDER COLLECTION Report No.: 155813 Project No.: 015729 Date of Serv~e: 07/31/2002 Report Date: 08/07/2002 Report of Collection On this date, a Rone Engineers, Inc. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: Page i of i Teehn~_i__n_n_: Jo~ Jemigan R~m~t Distribution: (l) city of coppea (1) City of Co~i (1} mfn~am~u~ ~ Inc. (1) Schrickel, Rollins & Assoc., Inc. 1:30 pm to 3:00 pm Proje~tManag~ LIMITATIONS: The te~ results presented her~in were preparod based upon tbe specific sampl~ provided for ~slin8. We assume no re~pensibility for veria~on in qnsli'0/ (c, ompo~io~, ~e, p~rformalw, e, etc.) or ally other f~atttro of ~imilar subject mat~' p~vid~d by persons o~ conditions over which we have no control. Our letters and ~mrts are for the exclusive use of the clients to whom thc'3, are .aareaaed and shall not be ~-producod ~xcept in full without the writ~u approval of Ronc Engineers, Ins. 99CM Pa~e I of 1