SC-Coppell MSW-LR020802FUGRO SOUTH, INC.
CORD
2880 Virgo Lane; Dallas, Texas 75229
Ph(972)484 -8301; Fax(972)620 -7328
c
l
OBSERVATION
CLIENT:
PROJECT:,
ISD, c/o K A Sparks
F CONCRETE PLACEMENT
pell, Texas
REPORT DATE: August 2, 2002
PROJECT NO: 0701 -2192
DATE PERFORMED: August 1, 2002 1
General Contractor: Cortez
Method Of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Firelane on south side of school building
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range ( °F):
Strength required (psi /days):
Number of cylinders made:
Superplasticizer used:
Dumitru Balas
Fugro South Technician
7:00 a.m.
10:40 a.m.
80
5 -1/2
5.0
Hanson - Plant No. 27
86 °F
4,000/28
4
No
FUGRO SOUTH, INC.
Reviewed By: e�
SMH /bg
Distribution: K A Sparks Contractors Inc. — Jim Schooler
K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228)
City of Coppell - Lee Stone
City of Coppell - Garreth Campbell
Coppell ISD - Mickey Harper
SHW Group — Mike Elmore
SHW Group — Dale Lilljedahl