Loading...
SC-Coppell MSW-LR020802FUGRO SOUTH, INC. CORD 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301; Fax(972)620 -7328 c l OBSERVATION CLIENT: PROJECT:, ISD, c/o K A Sparks F CONCRETE PLACEMENT pell, Texas REPORT DATE: August 2, 2002 PROJECT NO: 0701 -2192 DATE PERFORMED: August 1, 2002 1 General Contractor: Cortez Method Of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Firelane on south side of school building following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: Dumitru Balas Fugro South Technician 7:00 a.m. 10:40 a.m. 80 5 -1/2 5.0 Hanson - Plant No. 27 86 °F 4,000/28 4 No FUGRO SOUTH, INC. Reviewed By: e� SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl