SC-Coppell MSW-LR020729 (2)FUGRO SOUTH, INC.
=t ��'
1
2880 Virgo Lane; Dallas, Texas 75229
Ph(972)484 -8301; Fax(972)620 -7328
FIELD DENSITY REPORT
CLIENT: Coppell ISD, c/o K A Sparks Report Date: July 29, 2002
PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0701 -2192
DATE PERFORMED: July 20, 2002
Density Test Method: ASTM D -2922 & 3017 Method of Compaction: ASTM D -698
MOISTURE /DENSITY RELATIONS
Material Proctor Results
Number Description Maximum Dry Density (pcf) Optimum Moisture ( %)
1 Dark brown sandy silty clay with gravel (lime 117.4 11.4
treated)
TEST RESULTS
TEST
PROCTOR
LOCATION
UNIT DRY
MOISTURE
PERCENT OF
NO.
NO.
WEIGHT
CONTENT PERCENT
MAXIMUM DENSITY
32
1
1201 Wrangler Bus Drop area, 30 feet
112.9
12.1
96.2
East & 40 feet South of parking area, final
lift
33
1
1201 Wrangler Bus Drop area, 50 feet
115.4
11.8
98.3
East & 30 feet South of roadway, final lift
34
1
Teacher's parking area, 10 feet South &
111.6
12.0
95.1
70 feet East, final lift
35
1
Teacher's parking area, 40 feet South &
115.9
12.3
98.7
60 feet East, final lift
Remarks: All densities meet project specifications unless otherwise noted.
Thomas Cranford
Fugro South Technician
FUGRO SOUTH INC.
Reviewed By: T) -
SMH /nl
Distribution: K A Sparks Contractors Inc. — Jim Schooler
K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228)
City of Coppell - Lee Stone
City of Coppell - Garreth Campbell
Coppell ISD - Mickey Harper
SHW Group — Mike Elmore
SHW Group — Dale Lilljedahl
FUGRO SOUTH, INC.
ORD
:1
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
LIME STABILIZED SOIL PULVERIZATION REPORT
CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: July 29, 2002
PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0701 -2192
DATE PERFORMED: July 19, 2002
Contractors on Site: B.R.J. Paving & C.M.S. West
Remarks: Pulverization /Gradation tests were performed. Locations and results are listed below:
LIME STABILIZED SOIL PULVERIZATION TEST RESULTS
Percent Percent
Location Passing 1 3/4" Passing #4
Sieve I ' I Sieve
1 Wrangler Circle, station # 8002 100 66
2 Wranger Circle, station # 8002 100 70
Project Requirements: ( 2) Minimum 100% Minimum 60%
At roadway moisture condition.
( 2) Item 4.6 of Standard Specifications for Public Works Construction of North Central Texas
Council of Governments, 1993 Edition.
Thomas Lampitt
Fugro South Technician FUGRO SOUTH, INC.
Reviewed By: ' f
SMH/ nl
Distribution: K A Sparks Contractors Inc. — Jim Schooler
K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228)
City of Coppell - Lee Stone
City of Coppell - Garreth Campbell
Coppell ISD - Mickey Harper
SHW Group — Mike Elmore
SHW Group — Dale Lilljedahl