SS9901-CS0203255sgg
TurnerCollieOBraden Inc.
ENGINEERS-PLANNERS-PROJECT MANAGERS
17300 Dallas Parkway
Suite 1010
Dallas, Texas 75248
972 - 735 -3000
Fax 972 - 735 -3001
To: Mr. Kenneth M. Griffin, P.E
TRANSMITTAL
Director of Engineering and Public Works
City of Coppell
255 Parkway Boulevard P.O. Box 478
Coppell, Texas 75019 -4409
Date: March 25, 2002
Re: Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements
Force Mains Lines "A" and B "B
95% Submittal
Job No.: 15- 31124 -001
Transmitted By: Overnight
We are sending you the following:
Copies Description
5 Sandy Lake 20" Force Main Line "A" and DeForest 30" Force Main Line `B"
Remarks:
This submittal is considered 95 % complete. The review comments made on the previous submittal
have been addressed in this set of plans. After review of this submittal, the plans for Line "A" and
"B" should be ready for bid.
Copies To: File
By:
Ted
V