Lam Lee-CS020814T H E C 1 T Y O F
COPPELL
T ~~' ~ "~ o
e x ^ s, , 8 a
August 14, 2002
Ken Newman
Scott & Reid General Contractors, Inc.
15303 N Dallas Parkway
Suite 150
Addison, TX 75001
RE: Notification ofRepairs /Maintenance Bond
Lam Lee Addition
Dear Sirs:
Representatives of the City of Coppell have conducted an inspection of the referenced project.
There are maintenance issues that need to be addressed prior to the expiration of the maintenance
bond. The deficiencies that were discovered during this inspection must be corrected in a timely
manner in accordance with the bond covering this work, therefore, I request that you please contact
me at 972-304-3684 to set up a site meeting.
Sincerely,
cc: Ken Griffin, Director of Engineering
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
233 PARKWAY * P.O.BO% 478 * COP PELL T% 73019 * TEL 972/462 0022 * FA% 972/304 3673