Loading...
SC-Coppell MSW-LR020726 ~ ..-~.. GI~O FUGRO SOUTH, INC. k~ k~ 2880 Virgo L~ne~ Dallas, Te×a$ ?5229 Ph (972) 484-8301~ Fax (~72) 820-7328 OBSERVATION OF ( ONCRETE PLACEMENT CLIENT: Coppell lSD, c/o K A__/_/_/_/_/_/~~ ~ REPORT DATE: July 26, 2002 PROJECt L;oppell Middle School West, Coppell, Tex.~ PROJECT NO: 0701-2192 DATE PERFORMED: July 24, 2002 General Contractor: CMS West Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Paving: 50 feet north of Wrangler Drive to 1,000 feet following location: north of Wrangler Circle Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 4:00 a.m. 4 3/4 to 6 1/2 5 Hanson 88 to 92°F 4000/28 12 No Plant # 29 Thomas Lampitt Fugro South Technician FUGRO SOUTH, INC. SMH/nl Distribution: Reviewed By: '~ K A Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc. - Jerry Jones (Fax: 972-393-1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell~ Coppell lSD - Mickey Harper SHW Group - Mike Elmore SHW Group - Dale Lilljedahl