SC-Coppell MSW-LR020726 ~ ..-~.. GI~O
FUGRO SOUTH, INC. k~ k~
2880 Virgo L~ne~ Dallas, Te×a$ ?5229
Ph (972) 484-8301~ Fax (~72) 820-7328
OBSERVATION OF ( ONCRETE PLACEMENT
CLIENT: Coppell lSD, c/o K A__/_/_/_/_/_/~~ ~ REPORT DATE: July 26, 2002
PROJECt L;oppell Middle School West, Coppell, Tex.~ PROJECT NO: 0701-2192
DATE PERFORMED: July 24, 2002
General Contractor: CMS West
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Paving: 50 feet north of Wrangler Drive to 1,000 feet
following location: north of Wrangler Circle
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
4:00 a.m.
4 3/4 to 6 1/2
5
Hanson
88 to 92°F
4000/28
12
No
Plant # 29
Thomas Lampitt
Fugro South Technician
FUGRO SOUTH, INC.
SMH/nl
Distribution:
Reviewed By: '~
K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Jerry Jones (Fax: 972-393-1228)
City of Coppell - Lee Stone
City of Coppell - Garreth Campbell~
Coppell lSD - Mickey Harper
SHW Group - Mike Elmore
SHW Group - Dale Lilljedahl