Town Center L3B3-CS020815T X E • C 1 T Y • O F
August 15, 2002
Tony Montero
MYCON General Contractors, Inc.
208 E Louisiana #208
McKinney, TX 75069
RE: First American Bank (Town Center Addition, Lot 3 Block 3)
Final Walk -thru
Dear Tony:
Please be advised that a walk - through has been scheduled for Thursday, August 22, 2002 at 9:00
a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call 972- 304 -7090 at your earliest convenience.
Sincerely,
Rick O'Dell
Construction Inspector
Office Phone: (972) 304 -7090
Fax: (972) 304-3570
cc: Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal