Northlake 635(5)-CS020816 (3)T H E C 1 T Y O F
COPPELL
t
T ~ ~/. ~ ' t,~ p
9
X A S l a
August 16, 2002
Jaime Beard
Halff Associates
8616 Northwest Plaza
Dallas, Texas 75225
RE: Coppell Commerce Center Phase I, Blk D (Northlake 635 Business Park)
)Parking Lot )expansion
Dear Mr. Beard:
The City of Coppell has reviewed the revised plans for the referenced addition and with the
following conditions, the plans will be approved.
1. Return the marked plans from the first review.
Please submit copies of the plans for the City Engineer's stamp. The City of Coppell requires
three sets for its use; your office should submit as many additional sets as necessary for
construction operations. All contractors and subcontractors onsite must have a copy of the plans
approved by the City of Coppell.
All fees must be paid prior to release of this project for construction. These fees consist of
construction inspection fees to be paid to this office. The City assesses a 2% inspection fee for
all private construction and 4% for public installations. A completed Construction Development
Permit application is also required. If you have any questions, please contact me at (972) 304-
3681.
Sincerely,
~~1.N
Teresa M. Turner, E.I.T.
Graduate Engineer
255 PARKWAY * P.O.ROX 4]8 * COPPE LL TX ]SOI9 * TEL 9]2/462 0022 * FAX 972/304 3673