Gateway BP(2.3)-CS020816August 16, 2002
Terrance Wright
Wright Group
1110 S. Elm Street
Carrolton, Texas 75006
RE: Gateway Business Park, Lots 1R 2R, Block C
Parking Lot Expansion
Dear Mr. Wright:
The City of Coppell has reviewed the plans for the referenced addition and with the following
condition, the plans will be approved.
1. Provide inlet protection for the drainage inlet on the erosion control plan.
Please submit copies of the plans for the City Engineer's stamp. The City of Coppell requires
three sets for its use; your office should submit as many additional sets as necessary for
construction operations. All contractors and subcontractors onsite must have a copy of the plans
approved by the City of Coppell.
All fees must be paid prior to release of this project for construction. These fees consist of
construction inspection fees to be paid to this office. The City assesses a 2% inspection fee for
all private construction and 4% for public installations. A completed Construction Development
Permit application is also required. If you have any questions, please contact me at (972) 304-
3681.
Sincerely,
Teresa M. Turner, E.I.T.
Graduate Engineer
T H E •C 1 T Y •O F
COPPELL
255 PARKWAY P,O.BOX 478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673