August 16, 2002
Don Peveyhouse
Nova Construction Co., Inc.
10514 Wire Way
Dallas, Texas 75220
FAX 972/869 -297
RE: Reinforced Concrete Pavement Repair Project # FY00 /O1
Dear Peveyhouse,
Listed below are items that must be addressed prior to final acceptance of the captioned:
1. Seal all sawed and construction joints in the pavement sections.
2. Dress up along alley between Simmons and London Way.
3. During the repair at 53 The road c rest
late was damaged during removal and ms remov
t be replaced.
ed.
from the alley failure p
Additionally, no final walk through has been conducted on this project and must be
at 9 pr
t acceptance. This can be accomplished during the sealing process. You may c
3685 if you have any questions.
Sincerely,
Camp 1
Construction Inspector
cc: Kenneth M. Griffin, Din of Engineering and Public Works