Loading...
MA FY 00/01-CS020816T H_.E C T Y F - O- COFF!4LL�.� Cl a August 16, 2002 Don Peveyhouse Nova Construction Co., Inc. 10514 Wire Way Dallas, Texas 75220 FAX 972/869 -297 RE: Reinforced Concrete Pavement Repair Project # FY00 /O1 Dear Peveyhouse, Listed below are items that must be addressed prior to final acceptance of the captioned: 1. Seal all sawed and construction joints in the pavement sections. 2. Dress up along alley between Simmons and London Way. 3. During the repair at 53 The road c rest late was damaged during removal and ms remov t be replaced. ed. from the alley failure p Additionally, no final walk through has been conducted on this project and must be at 9 pr t acceptance. This can be accomplished during the sealing process. You may c 3685 if you have any questions. Sincerely, Camp 1 Construction Inspector cc: Kenneth M. Griffin, Din of Engineering and Public Works . 5019 * TEL 972/462 0022 * FAX 972/3O4 367 255 PARKWAY * P O.BOX 476 * COPPELL TX 7