Loading...
Shadydale Lot 2C-CS020819T H E C I T Y O F COPPEL L e 9 S August 19, 2002 Mr. Kelly Jordan Excel Group, Inc. 2639 Walnut Hill Ln, Suite 103 Dallas, Texas 75229 RE: Stuart O'Neal Office Building Final Acceptance - Pending Dear Mr. Jordan: Representatives of the City of Coppell performed a final walk -thru and inspection of paving and utilities for the referenced project on October 30, 2001. Other than a few relatively minor issues, the project seemed complete and ready to be accepted. The as-built drawings have been received from the engineer; however, the two -year maintenance bonds have yet to be forwarded to this office. The project will not be accepted as final until these bonds are received. Maintenance bonds for paving, utilities and drainage structures must be issued for 50% of the contracted work performed and written for a duration of two years by a reputable surety firm. Maturity on the bonds will be two years from the date of issuance of the Final Acceptance Letter. cc: Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary 255 PARKWAY * P.O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673