Loading...
ST0001-LR0208138908 Ambassador Row Dallas, Texas 752474510 (214) 630 -9745 (214) 630 -9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 154140 Attn: Ms. Susan Taylor - Engineering Dept Project No.: 015729 PO Box 478 Date of Service: 07/12/2002 Coppell TX 75019 Report Date: 08/13/2002 Project: Creekview Drive and rrwe/ TIME SAMPLED: 8:10am BATCH TIME: 7:04am Freeport Parkway 3000 psi @ 28 Days Coppell, TX SLUMP (in): Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. AIR ( %): PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. MIX DESIGN LD.: 38 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 07/12/2002 PLANT: 6 WEATHER CONDITIONS: Partly cloudy SPECIFICATION REQUIREMENTS TIME SAMPLED: 8:10am BATCH TIME: 7:04am STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) -AIR 84 F CONCRETE: 86 F SLUMP (in): 3 - 5" TRUCK NO: 761 TICKET NO: 6178991 AIR ( %): 3%- AIR CONTENT ( %): 3.1 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Sidewalk from Station 12+00 through Station 15+00 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 SAMPLE LOCATION: Station 13 +00 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (Inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.5 07/19/2002 7 93770 3320 Unbonded Cap 1 2 5.5 08/09/2002 28 115880 4100 Unbonded Cap 1 3 5.5 08/09/2002 (f 28 120230 Unbonded Cap �/ Average 4180 1 4 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. O1DK Page 1 of 2 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. MIX DESIGN I.D.: 38 8908 Ambassador Row Ro �� �� PLACEMENT DATE: 07/12/2002 Dallas Texas 75247 -4510 (214) 630 -9745 �' WEATHER CONDITIONS: Partly cloudy (214) 630 -9819 (fax) TIME SAMPLED: 9:00am BATCH TIME: 7:58am STRENGTH: 3000 psi R@ 28 Days TEMPERATURE (F) -AIR 83 F CONCRETE: 86 F CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 154140 Attn: Ms. Susan Taylor - Engineering Dept Project No.: 015729 PO Box 478 Date of Service: 07/12/2002 Coppell TX 75019 Report Date: 08/13/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. MIX DESIGN I.D.: 38 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 07/12/2002 PLANT: 6 WEATHER CONDITIONS: Partly cloudy SPECIFICATION REQUIREMENTS TIME SAMPLED: 9:00am BATCH TIME: 7:58am STRENGTH: 3000 psi R@ 28 Days TEMPERATURE (F) -AIR 83 F CONCRETE: 86 F SLUMP (in): 3° - 511 TRUCK NO: 1123 TICKET NO: 6179001 AIR ( % 3%- AIR CONTENT ( % NA UNIT WEIGHT (peo: NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: 3.5 ASTM C -31 Grade beam from Station 1 +50.32 through Station 4+05.32 88220 ASTM C -143 Unbonded Cap 2 2 ASTM C -231 08/09/2002 28 ASTM C -1064 4120 Unbonded Cap ASTM C -138 SAMPLE LOCATION: Station 2 +75 08/09/2002 ASTM C -39 REPORT OF TESTS 4090 Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (ibs. force) (psi) TYPE 2 1 3.5 07/19/2002 7 88220 3120 Unbonded Cap 2 2 3.5 08/09/2002 28 116570 4120 Unbonded Cap 2 3 3.5 08/09/2002 28 115745 4090 Unbonded Cap Average 4110 2 4 Technician: Jarrod Miller Report Distribution: (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. Hold Started: 6:30am Finished: 9:0( LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. O1DK Page 2 of 2 Project Manager 8908 Ambassador Row a Dallas, Texas 75247-4510 Ro n eE n g i nee rs (214) 630 -9745 (214) 630 -9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 154247 Attn: Ms. Susan Taylor - Engineering Dept Project No.: 015729 PO Box 478 Date of Service: 07/12/2002 Coppell TX 75019 Report Date: 08/13/2002 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. MIX DESIGN I.D.: 42 CONCRETE SUPPLIER: Lattimore PLACEMENT DATE: 07/12/2002 PLANT: 6 WEATHER CONDITIONS: Partly cloudy SPECIFICATION REQUIREMENTS TIME SAMPLED: 7:35am BATCH TIME: 6:27am STRENGTH: 3000 psi @R, 28 Days TEMPERATURE (F) -AIR 74 F CONCRETE: 82 F SLUMP (in): Y-5 11 TRUCK NO: 939 TICKET NO: 6178989 AIR ( %): 3%-5% AIR CONTENT ( %): 3.1 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: 3520 ASTM C -31 Paving on State from Station 36 +22.55 through Station 36 +22.45 07/19/2002 ASTM C -143 105470 3730 ASTM C -231 1 3 4.5 08/09/2002 ASTM C -1064 139785 4940 ASTM C -138 SAMPLE LOCATION: Station 36 +22.50 08/09/2002 ASTM C -39 REPORT OF TESTS 4930 Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.5 07/15/2002 3 99455 3520 Unbonded Cap 1 2 4.5 07/19/2002 7 105470 3730 Unbonded Cap 1 3 4.5 08/09/2002 28 139785 4940 Unbonded Cap 1 4 4.5 08/09/2002 28 139495 4930 Unbonded Cap Average 4940 Technician: Jarrod Miller Started: 6:30am Finished: 9:00am Rone E r , c. Report Distribution: (1) City of Coppell (1) City of Coppell Clay St k (1) Infrastructure Services, Inc. Project Manager (1) Schrickel, Rollins & Assoc., Inc LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rome Engineers, Inc. DIDK Page 1 of 1