PA9702-LR 991001GROUT COMPRESSI(' STRENGTH TEST
8901 Carpenter Frwy, Suite
Dallas, Texas 75247
Date of Service: 08/30/1999 Report No.: 9923519 Report Date
10/01/1999
Client No.: COPPELL ProjectNo.: 94991118
Client: City of Co ell Project: Coppell Aquatic/Recreation Ctr
Attn: Bra~VF~eid
732 DeForest 300 Block of Parkway Blvd
Coppell TX 75019 Coppell, Texas/Prj. #96051
Services: Sample grout from delivery vehicle, cast 3" x 3" x 6" prisms in accordance with the recommendations of
ASTM C 1019.
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. GROUT CLASS: N/A
GROUT SUPPLIER: On-site PLACEMENT DATE: 08/30/1999 BATCH TIME: ll:45am
PLANT: N/A TmXE SAMPLED: 12:00pro BY: Del Ratlift
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Hot,clear
STRENGTH: 2000 psi @ 28 Days TEMPERATURE (F) - Ant 90 F GROUT: 93 F
TntXCK NO: N/A TICKET NO: N/A
TEST METHOD: ASTMC1019 PLACEMENTLOCATION: West wall of gyranasium
SAMPLE LOCATION: 20' N of SW bldg comer
SAMPLE SIZE: 3" X 3" X 6"
REPORT OF TESTS
pRISM MEASURED MAXIMUM COMPRESSIVE
MARKED SLIfMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
1 I 5.00 09/06/1999 7 56260 5760
1 2 5.00 09/27/1999 28 65750 6110
I 3 5.00 09/27/1999 28 61300 6030
Average 6070
Technician: Del Ratlift Started: 1 l:00am Finished: 12:00pm H~E '~
Report Distribution:
( 1 ) City of Coppoll ( 1 ) City of Coppe II - Eagineering
(1) BlinkIcy Sargent Architects (1) City ofCoppell - Bldg. [nsp.
(1) Turner Engineers (I) City ofCoppell - Leisure Scrv Dept Vice President
(1) Hisaw & Associates
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wfiitcn approval of HBC Engineering, Inc.
09Ti~P Page 1 of I