Loading...
PA9702-LR 991001GROUT COMPRESSI(' STRENGTH TEST 8901 Carpenter Frwy, Suite Dallas, Texas 75247 Date of Service: 08/30/1999 Report No.: 9923519 Report Date 10/01/1999 Client No.: COPPELL ProjectNo.: 94991118 Client: City of Co ell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~VF~eid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Sample grout from delivery vehicle, cast 3" x 3" x 6" prisms in accordance with the recommendations of ASTM C 1019. PROJECT DATA CONTRACTOR: Hisaw & Assoc. GROUT CLASS: N/A GROUT SUPPLIER: On-site PLACEMENT DATE: 08/30/1999 BATCH TIME: ll:45am PLANT: N/A TmXE SAMPLED: 12:00pro BY: Del Ratlift SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Hot,clear STRENGTH: 2000 psi @ 28 Days TEMPERATURE (F) - Ant 90 F GROUT: 93 F TntXCK NO: N/A TICKET NO: N/A TEST METHOD: ASTMC1019 PLACEMENTLOCATION: West wall of gyranasium SAMPLE LOCATION: 20' N of SW bldg comer SAMPLE SIZE: 3" X 3" X 6" REPORT OF TESTS pRISM MEASURED MAXIMUM COMPRESSIVE MARKED SLIfMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 I 5.00 09/06/1999 7 56260 5760 1 2 5.00 09/27/1999 28 65750 6110 I 3 5.00 09/27/1999 28 61300 6030 Average 6070 Technician: Del Ratlift Started: 1 l:00am Finished: 12:00pm H~E '~ Report Distribution: ( 1 ) City of Coppoll ( 1 ) City of Coppe II - Eagineering (1) BlinkIcy Sargent Architects (1) City ofCoppell - Bldg. [nsp. (1) Turner Engineers (I) City ofCoppell - Leisure Scrv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wfiitcn approval of HBC Engineering, Inc. 09Ti~P Page 1 of I