Dry Clean & Donut-CS020820August 20, 2002
Dave Randhawa
DR Construction
3605 Whiffletree Dr
Plano, TX 75023
RE: Dry Clean City/Donut City
Third Notice of Deficiencies
Dear Dave:
Sincerely
Larry 'i avis
Construction Inspe tor
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
Tom Nguyen
2825 Kings Gate Dr.
Carrollton, TX 75006
T H E C 1 T Y O F
COPPELL
r 0 z
As requested in the attached letters of June 11 and July 11, 2002, there are still two major issues
that must be resolved before the City of Coppell will issue a Final Acceptance letter for the
referenced project. The required two -year maintenance bonds have not been received as of
today's date, nor have lab- testing reports on the paving subgrade been provided to this office.
Please call my office at 972 -304 -3684 to set up a meeting so that we can discuss the mitigation of
these deficiencies.
cc: Ken Griffin, Director of Engineering Public Works
Rhonda Brothers, Engineering Secretary
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
255 PARKWAY P.O.BOX 476 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673
June 11, 2002
Dave Randhawa
DR Construction
3605 Whiffletree Dr
Plano, TX 75023
RE: Dry Clean City/Donut City
Final Acceptance Pending
Dear Dave:
Representatives of the City of Coppell performed a final walk thru inspection of paving and
utilities for the referenced project May 16, 2002. It appears that all construction items have been
addressed and corrected. However, the two -year maintenance bonds have not been received nor
have lab- testing reports on the paving subgrade been provided to this office.
These two remaining items must be forwarded to the Engineering Department as soon as possible
in order for the project to be accepted by the City of Coppell. Please make this a priority so that
the project can be completed in a timely manner for all concerned.
SincerelJ
Larry
Cons
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
cc: Ken Griffin, Director of Engineering Public Works
Rhonda Brothers, Engineering Secretary
Tom Nguyen
2825 Kings Gate Dr.
Carrollton, TX 75006
T N C 1 T Y O F
COPPELL
r .r
F 9
255 •AKKWAY I.O.•OX •79 COrrc.L TX 75019 TILL 972/162 0022 FAX 972/304 3673
July 11, 2002
Dave Randhawa
DR Construction
3605 Whiffletree Dr
Plano, TX 75023
RE: Dry Clean City/Donut City
Second Notice of Deficiencies
Sincerely
Tom Nguyen
2825 Kings Gate Dr.
Carrollton, TX 75006
T X C C l r Y 0 F
LL
COPPE
�?te
Dear Dave:
As requested in the attached letter of June 11, 2002, there are two major issues that must be
resolved before the City of Coppell will issue a Final Acceptance letter for the referenced project
The required two-vear maintenance bonds have not been received as of today's date, nor have
lab- testing reports on the paving subgrade been provided to this office.
It is imperative that these two remaining items be forwarded to the Engineering Department.
Please call my office at 972- 304 -3679 to set up a meeting so that we can discuss the future
consequences of these deficiencies.
Larry lavis
Construction Inspector
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
cc: Ken Griffin, Director of Engineering Public Works
Rhonda Brothers, Engineering Secretary
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
255 PARKWAY t P.O.5OX •76 t COPPELL TX 75019 TEL 972/162 0022 t FAX 972/304 3673